Laserfiche WebLink
ZEVNIK HORTON GUIBORD & MCGOVERN <br /> Donald T. Bradshaw, R.G. <br /> Levine•Fricke•Reeon Inc. <br /> August 12, 1997 <br /> Page 2 <br /> (3/4) of an inch above grade to prevent standing water from entering the enclosure. In addition, <br /> LPL suggests that the concrete pad around the new well box should be at least three (3) feet in <br /> diameter and at least six (6) inches thick. <br /> Finally, LPL presumes that the two thousand five hundred dollar($2,500.00)figure <br /> set forth in your August 5, 1997 correspondence is a firm estimate of the costs associated with the <br /> repair activities. If not, please notify LPL immediately so that it may obtain such firm estimates <br /> for the repair work. <br /> Cordially, <br /> �Vv <br /> Douglas W. Michaud <br /> cc: Wilbur H. Smith II, Esq. <br /> General Counsel, Lincoln Properties, Ltd, <br /> Michael C. Donovan, Esq. <br /> A. J. Birkbeck, Esq. <br /> John C. Meyer, Esq. <br /> Steven McMahon Zeller, Esq. <br /> Zevnik Horton Guibord & McGovern <br /> Robert C. Thompson, Esq. <br /> LeBoeuf, Lamb, Greene & MacRae <br /> Stephen R. Henshaw <br /> Henshaw Associates <br /> Anne Farr, Ph.D. <br /> AUG 12 '97 17:00 1 312 977 2560 PRGE.03 <br />