Laserfiche WebLink
Engineer's Estimate <br /> Engineer's <br /> estim ate <br /> Item approumate Unit of Unit price Total <br /> number quantity measure Item (in figures) (in figures) <br /> I — Force account including permits 5,000 <br /> 2 -- Lump sum Decontamination of equipment, -- 2,590 <br /> waste containment, and sampling <br /> 3a 3 Each Prepare wells LVMDI, LVMD4, 2,000 6,000 <br /> and LVMD6 <br /> 3b 1 Each Prepare well LVMD2 2,400 2,400 <br /> 4 800 LF Perforate and destroy wells 27.85 22,280 <br /> 5 4 Each Surface preparation 950 2,850 <br /> 6 24 Cu yd Grout wells 225 5,400 <br /> 7 4 Each Surface preparation and 1,570 6,280 <br /> completion <br /> 8 8 Cu yd Soil disposal Class III disposal 55/cu yd 440 <br /> 9 3,400 gal Groundwater disposal 0.70/gal 2,400 <br /> Total -- _ <br /> 55,640 <br /> Note: Cu yd = cubic yams <br /> Gal = gallons <br /> LF=linear foot <br /> 669 V SPECMNGR.EST.TE L <br />