Laserfiche WebLink
Levine.Fricke.Recon <br /> ENGINEERS,HVDROGEOLOGISTS 8 APPLIED SCIENTISTS <br /> • B-zone monitoring wells will be installed on Inglewood Avenue in July as part of the Plume <br /> Perimeter Investigation. <br /> • Phase I IRA off-site piezometer installation and conveyance piping, treatment system, and <br /> TSA construction will continue through June and July. <br /> Documents Submitted or Received <br /> The following documents were completed and issued during the bimonthly period: <br /> • The "Quarterly Groundwater Monitoring Report, January 1 through March 31, 1997 (First <br /> Quarter 1998), Lincoln Center, Stockton, California," dated May 15, 1998. <br /> • The "Interim Source Area Remedial Investigation Report, Lincoln Center, Stockton, <br /> California," was issued to all parties on May 22, 1998. <br /> • Draft revisions to the "Quarterly Monitoring Plan, Lincoln Center, Stockton, California," <br /> dated May 3, 1996, and revised April 8, 1997, were submitted to the RWQCB on May 22, <br /> 1998. Changes include revised sample locations. <br /> Draft revisions to the "Work Plan for Environmental Investigation, Lincoln Center, Stockton, <br /> California," dated September 23, 1996, and revised October 15, 1997, were submitted to the <br /> RWQCB on May 22, 1998. Changes include revised sampling and updated laboratory <br /> procedures for the following appendices: <br /> 1. Field Sampling Plan (FSP; Appendix B), Revision 4 <br /> 2. Quality Assurance Project Plan (QAPP; Appendix C), Revision 5 <br /> 3. Health and Safety Plan (Appendix F), Revision 1 <br /> • Advance notification of field work was mailed to residents and businesses in the immediate <br /> vicinity of Locations 2, 3, 4, 8, 9, and 10 for the CPT/PIPP Plume Perimeter Investigation in <br /> the neighborhoods upgradient and downgradient of Lincoln Center on May 20, 1998. <br /> • Advance notification of field work was mailed to businesses located on the frontage road along <br /> Pacific Avenue in the immediate vicinity of Phase I IRA piezometer installations on May 20, <br /> 1998. <br /> • Permit applications for field activities, including the Source Area Investigation, Plume <br /> Perimeter Investigation, and Phase I IRA, were submitted to the San Joaquin County Public <br /> Health Services, Environmental Health Division; San Joaquin County Department of Public <br /> Works; and City of Stockton Public Works Department. <br /> Bimonthly-1u 98-04111:SRL 3 <br />