Levine-Fricke-Recon <br /> ENGINEERS,M MOGEO JSTS 6 AP UeO SCIENTISTS <br /> plan). Weeks Drilling and Pump Company will install the groundwater extraction wells using <br /> the mud-rotary drilling method. Field equipment for the extraction well installations will consist <br /> of a mud-rotary drilling rig, shaker trailer, and support vehicles. The work space will be <br /> cordoned off during the drilling period to prohibit access by unauthorized personnel. <br /> Well GEW-007A <br /> Construction of well GEW-007A will begin with sawcutting a 24-inch-square hole in the concrete <br /> pavement adjacent to the small planter as shown in Figure 1. Based on the remodeled <br /> configuration of the Subject Property, it appears that the most northern of the two driveways along <br /> Pacific Avenue will be partially blocked by the drilling rig during construction of this well. Once <br /> the well is constructed, the well casing will be covered with a 12-inch-diameter well box installed <br /> at grade with a bolt-down cover and the remainder of the 24-inch-square hole will be resurfaced <br /> with concrete or cold patch asphalt. The well box will be replaced subsequently during trenching <br /> activities in step two. <br /> Well GEW-008A <br /> Well GEW-008A will be constructed within the corner planter as shown in Figure 1. We <br /> anticipate that at least one bush or shrub will need to be removed and transplanted to provide room <br /> for the well. Once the well is constructed, the well casing will be covered with a 12-inch-diameter <br /> well box with a bolt-down cover installed several inches above grade to avoid flooding from <br /> irrigation. This well box will also be replaced subsequently during trenching activities in step two. <br /> While all efforts will be made to minimize damage to the plants in the planter during drilling, <br /> there is a possibility that the groundeover plants may be damaged. Considering that additional <br /> excavation for the utility trench will take place soon after the well is installed, we propose to <br /> refurbish the planter box after all construction activities have been completed. <br /> Before conducting these intrusive field activities, buried utilities that are present in the vicinity of <br /> Elie wells will be located and discretely marked on the ground with paint to prevent any contact <br /> with utilities during installation The active work space required during the night at each location <br /> is approximately 30 feet by 60 feet, as shown on Figure 2. The work area for each drilling <br /> location will be covered with a large, single sheet of visquene plastic to keep the area as clean as <br /> possible. <br /> Drilling will be performed only during nighttime hours, defined as between 8:00 p.m. and 7:00 <br /> a.m. At the end of each work shift, any waste materials or debris generated during field activities <br /> will be removed, extra vehicles driven off site, and the work area compressed as much as <br /> possible. At a minimum, tate drill rig, shaker trailer, and a small mud pit will need to remain setup <br /> on site until each well is completed. The estimated work spaces for active and inactive work <br /> periods are shown in Figure 2. The proposed timing and schedule for well construction is <br /> presented below. <br /> LIIAccm-Chcvwmrm.d-0371 I:SRL 2 <br /> STO/C001A 'y'5'] KOHAaH3 OLcs zb9 OTSQ U:96 961LZ/30 <br />