Laserfiche WebLink
Levine-Fricke-Recon <br /> ENGINEERS,Hv090GEOLOGI5T5!A PLIED SCIENT6 S <br /> during nighttime hours to minimize impact to the station. This work is expected to take <br /> approximately three to five days. LFR will provide Chevron with at least 48-hours notice of the <br /> actual start dates and times for these activities. <br /> Before LFR can install the extraction wells on the Subject Property, we must obtain well permits <br /> from the San Joaquin County Public Health Services, Environmental Health Division(SJC <br /> PHS/EHD). To issue the permits, the SIC PHS/EHD must have written permission from the <br /> Property owner and tenant to conduct the work on the Subject Property. Therefore, please sign the <br /> acknowledgment in the space indicated, transmit the signed document to me via facsimile at (510) <br /> 652-4906, and return the original document to me in the enclosed self-addressed, postage-paid <br /> envelope. We will need the signed acknowledgement by April 27, 1998 in order to complete the <br /> permitting process in time to install the extraction wells. <br /> If you have any questions or comments regarding our request, please do not hesitate to call me at <br /> (510) 596-9559 On behalf of the SDCDs, we thank you for your cooperation in this matter. <br /> Sincerely, <br /> Donald T. Bradshaw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> Attachments <br /> cc: Robert C. Thompson, Esq., LeBoeuf, Lamb, Greene & MacRae <br /> Wilbur H. Smith 1I, Esq., Pacific Oversight & Management Corporation <br /> Kit Custis, Regional Water Quality Control Board, Central Valley Region <br /> Lu-Aa=.*-Chv.wP-mvi3W.0411 t:SRL 5 <br /> STO/9001n 'V'S'0 NOHAUD OLC9 Zb9 OTS.9 9b:90 98/LZiSO <br />