Laserfiche WebLink
MAY 12 '9t 1Y36 PR L6U1NL—FRICKE—RECON 71N 672 4y06 IU 64263eO F'.waddlu'i <br /> 0 Levine•Fricke•Recon <br /> wa.�s I.roea�«mm e.rrrl,®Se@/IYq <br /> May 12, 1998 4111.38-004 <br /> Mr. Brea L. Hunter <br /> Chevron Products Company <br /> P.O. Box 5004 <br /> San Ramon, CA 9583-0804 <br /> Subject: Addendum to April 20, 1998 "Request for Access" Summarizing Site Meeting <br /> Regarding Access Issues For Phase I IRA Field Activities, Chevron Station No_ 9- <br /> 6171, Lincoln Center, Stockton, California(Parcel No. 097-41-48) <br /> Dear Brett: <br /> This letter follows our site meeting on May 6, 1998 at Chevron Station No- 9-6171 in Stockton, <br /> California. The following individuals attended the site meeting: <br /> • Brett Hunter. Chevron <br /> • Heather Heath, Chevron <br /> • Royce Cunningham, Levine-Fricke-Recon.(LFR) <br /> • Michael Glaser, LFR <br /> The purpose of the site meeting was to discuss and clarify several access issues related to <br /> performing field activities associated with the subject Phase I IRA. This letter is intended to serve <br /> as an addendum to our prior "Request for Access," requesting property access, dated April 20, <br /> 1998 from Mr- Don Bradshaw of LFR ("the Request"), and to document verbal agreements that <br /> were trade during the site meeting regarding these specific access issues. All other agreements <br /> regarding access are as described in the Request_ <br /> Location and Drilling of Extraction Wells <br /> As agreed in the site meeting, extraction well GF-W-7, extraction well GEW-8, and equipment box <br /> EB-I will he installed in concrete-paved areas in the vicinity of the locations shown in the Request. <br /> However, well GEW-8 will not be located in the landscape area as shown in previous figures. Both <br /> wells will be drilled as close to the concrete curb as is possible, while still providing room to install <br /> the required vault and piping. <br /> LFR clearly understands that it is important to prevent any disruptions to business and product <br /> delivery at the station while drilling the extraction wells. Therefore, LFR agrees to locate the <br /> drilling rig in a northwesterly alignment while drilling extraction well GEW-8 (see Figure 1 of the <br /> Request)- The drill rig will be located in a southwesterly alignment while drilling extraction well <br /> 1900 Powell Street, 12th Floor, Emeryville, Cali!o,n,a 94608-1827 • (510) 652-4500 • lar (510) 652-2246 <br /> OtOces worldwide <br /> UTO/OiOQI 'y'5'!1 hOH.13H� OLC9 Zt9 CITU$ 4f:90 961LZiUO <br />