My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:51 PM
Creation date
3/31/2020 2:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1998-2000
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 12 '9E 1736 FR LEVINE-FRICKE-RECON 510 652 43Wb 1u t 42t 3Yb r•4-1/we <br /> Levinee icke•Recon <br /> E.OINFFAS.M'OAWEM=Wl A ArillED 9CM'1MST2 <br /> GFW-7 (see Figure 1). While drilling well GEW-7, the drill rig will be located in such a mares r as <br /> to avoid the service island canopy, while maintaining a minimum of 12 feet of clearance from the <br /> southern property wall for tanker traffic. Access to all driveways will be maintained during the <br /> drilling operations. <br /> Trench Alignment <br /> Chevron has recently installed new concrete pavement at the station, along with other <br /> improvemeas. During the site meeting it was agreed that trenching activities associated with the <br /> Phase I IRA construction should minimize impacts to the structural and aesthetic value of the <br /> station improvements. LFR agreed to selectively saw-cut the concrete and use existing construction <br /> joins in such a manner that obvious visible signs of trenching will be minimized. <br /> The locations for the utility trench and vaults were determined during the site meeting, and the <br /> enact concrete panels to be cut were identified. The trench alignment and vault locations were <br /> verified in a sketch I sent by facsimile to you on May 7, 1998. Figure 2, which depicts this <br /> aligtunent, is attached. <br /> Other Access Issues <br /> During the site meering we discussed the period of construction. Trenching will be performed <br /> during the night when traffic is less heavy on Pacific Avenue and Ben Holt Drive. It was agreed <br /> that the entrance to the station on Ben Holt Drive will remain open at all times during the <br /> construction on the Chevron site. <br /> The two entrances on Pacific Avenue will need to temporarily be closed for brief periods when <br /> trenching is taking place. It was agreed that at least one of these entrances will remain open at all <br /> times during the construction. It was also agreed that each entrance only be closed while trenching <br /> and intrusive activities on that entrance are taking place. When trenching and intrusive activities are <br /> complete during a particular shift, trench plates will be installed with asphalt cold patch along the <br /> edges, to provide frill access at all entrances during nonconstrucdon periods. <br /> If you have any questions or require additional information, please call me at (510) 596-9526. <br /> Sincerely, <br /> oe W. Cumin P.E. <br /> Senior Associate Engineer <br /> �Rc-e4 itnJd /QtcEi7C,d <br /> cc: John Gregory. LeBoeuf <br /> I,rdmoenxru..M.ygSLq ILrF.Gnr Z <br /> STo/TT0 'F'5':1 VOHAIHD OLCB US oTSQ Zt:90 96/1Z/so <br />
The URL can be used to link to this page
Your browser does not support the video tag.