My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:51 PM
Creation date
3/31/2020 2:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1998-2000
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 1998 <br /> Page 2 <br /> continued from page 1 and analyzed to ev to the extent of dry cleaning con- <br /> tamination at or near suspected source areas. <br /> Source Area Investigation <br /> A Source Area Investigation is being conducted at the Site Results of the Source Area Investigation and recommenda- <br /> to identify and characterize suspected or known dry clean- tions for further source area activities will be presented in <br /> ing contamination release areas along portions of the the Source Area Report,which will be available for public <br /> sanitary sewer system where leaks are suspected. This review in April 1998 at the document depository, as <br /> investigation also focuses on areas around the former and described below. <br /> current dry cleaning facilities.The initial phase of the Plume Perimeter Investigation <br /> Source Area Investigation identified potential areas of dry A Plume Perimeter Investigation is being conducted <br /> cleaning contamination.Past dry cleaning waste-handling concurrently with the Source Area Investigation to identify <br /> practices included the customary and standard disposal of and characterize the extent to which dry cleaning contami- <br /> wastewater containing dissolved dry cleaning fluids into the nation has migrated in groundwater away from the source <br /> sanitary sewers. Considering past practices, a video survey areas. CPT borings were advanced to investigate the <br /> of sewer lines at Lincoln Center was performed.The video, lithologic conditions in the vicinity of Lincoln Center and <br /> which examined approximately 1,850 feet of the sanitary collect groundwater samples from the A- and B-zone <br /> sewer, revealed numerous areas of sags, offsets, and aquifers.Monitoring wells were installed at 10 targeted <br /> cracks in the lines that could have contributed to leakage of a q <br /> locations to further evaluate the extent of dry cleaning <br /> dry cleaning contamination from the sewer lines into soil contamination in these zones, as well as in the deeper C- <br /> ard groundwater surrounding those lines. zone aquifer. Additional CPT borings, groundwater <br /> After identifying potential source areas,a soil-vapor samples, and monitoring wells have been recommended as <br /> survey was conducted to analyze for the presence of dry part of the ongoing Plume Perimeter Investigation.Results <br /> cleaning contamination.A soil-vapor survey is a study of these additional activities will be summarized in the RI <br /> performed to analyze vapor samples collected from unsat- Report,tentatively scheduled to be available in the fall of <br /> urated soils to determine if chemicals are present below the 1998. These investigations to date have shown that <br /> ground surface. Soil-vapor probes were driven into the groundwater contamination has moved offsite, east of <br /> ground at over 600 locations at the Site and were used to Lincoln Center, and to a lesser extent, west of Lincoln <br /> obtain soil-vapor samples at depths ranging between 3 and Center along the sanitary sewer line. <br /> 40 feet below ground surface (bgs). Over 800 soil-vapor Monitoring Activities <br /> samples were analyzed for dry cleaning contamination and/ Periodic monitoring of groundwater elevations and ground- <br /> or petroleum hydrocarbon compounds. This investigation water quality in over 25 site monitoring wells continues on <br /> identified locations at Lincoln Center where dry cleaning a quarterly basis. A monitoring well integrity assessment <br /> contamination is present in unsaturated soil. was conducted on existing wells to evaluate their suitability <br /> Suspected source areas were further investigated using a for use in the periodic monitoring program. A survey of <br /> cone penetration testing (CPT) rig to push an instru- public and private wells was also conducted to identify <br /> mented probe into the ground to obtain data regarding the wells in the vicinity of the Site that could be potentially <br /> types of soils encountered and to collect groundwater affected by groundwater containing dry cleaning contami- <br /> samples.Numerous locations were investigated to depths nation.Results of periodic monitoring,the well integrity <br /> of 70 to 120 feet bgs within the source area. Groundwater assessment, and the public and private well survey are <br /> samples were obtained from selected intervals within the A- documented in reports available for public review at the <br /> zone aquifer,the A/B aquitard,and the B-zone aquifer, document depository, as described below. <br /> PHASE I IRA ACTIVITIES <br /> The Phase I IRA is designed to control migration of Detailed Plan.The Phase I IRA Detailed Plan is a compre- <br /> groundwater containing dry cleaning contamination off of hensive document that presents the results of data collected <br /> Lincoln Center.Phase I IRA activities initially included field during the Source Area and Plume Perimeter Investigations <br /> scoping work to collect data necessary to design a shallow (to date) and the Phase I IRA Investigation, and discusses <br /> A-zone groundwater extraction and treatment system. the analyses that were performed leading to design of the <br /> Phase I IRA scoping activities included advancing CPT Phase I IRA. The Phase I IRA system will consist of <br /> borings near the downgradient (eastern)boundary of multiple extraction and monitoring wells completed in the <br /> Lincoln Center to assess the type of soil and presence of A-zone aquifer, connected to a treatment system(Figure <br /> dry cleaning contamination in the A-zone aquifer along the 2).The line of extraction wells will act as a barrier, which <br /> proposed alignment of the Phase I IRA extraction system, is designed to prevent contamination from moving east of <br /> installing two monitoring wells and one piezometer,per- Lincoln Center. Groundwater removed from the A-zone <br /> forming aquifer tests, and developing a groundwater model aquifer will be pumped to the treatment system,to be <br /> to simulate groundwater extraction scenarios. located on the south side of Lincoln Center, via an under- <br /> ground conveyance pipeline where it will be treated to <br /> Data collected during the ongoing RI activities and Phase I remove dry cleaning contamination.Following treatment, <br /> IRA scoping activities were evaluated in the Phase I IRA the water will be discharged under an RWQCB permit to a <br />
The URL can be used to link to this page
Your browser does not support the video tag.