My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:51 PM
Creation date
3/31/2020 2:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1998-2000
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Levine.Fricke•Recon <br /> ENGINEERS,HVDROGEOLOGISTS 8 APPLIED SCIENTISTS <br /> Anticipated Future Document Submittals <br /> The following documents are scheduled to be issued during the next bimonthly period: <br /> • Draft revisions to the "Quarterly Monitoring Plan, Lincoln Center, Stockton, California," <br /> dated May 3, 1996, and revised April 8, 1997. The revisions will include revised sample <br /> locations. <br /> • Draft revisions to the RDFS Work Plan, which will include revised sampling and updated <br /> laboratory procedures: <br /> 1. Field Sampling Plan (Appendix B), Revision 4 <br /> 2. Quality Assurance Project Plan (Appendix C), Revision 5 <br /> • Draft Interim Source Area Remedial Investigation Report <br /> • Final Phase I Interim Remedial Action Detailed Plan (to be submitted to the Court for <br /> approval) <br /> • Draft Phase II Interim Remedial Action Work Plan <br /> We have included the most current Schedule of Milestones as an attachment to this letter report. <br /> The next bimonthly letter report will be issued in April 1998. Please contact me if you have any <br /> questions or comments. <br /> Sincerely, <br /> Donald T. Bradshaw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> Attachments: Schedule of Milestones; Figure 1 <br /> cc: Distribution List <br /> bimonthly-feb98-0411 I:SRL 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.