Laserfiche WebLink
Levine.Fricke•Recon <br /> ENGINEERS,HVDROGEOLOGISTS 8 APPLIED SCIENTISTS <br /> Anticipated Future Document Submittals <br /> The following documents are scheduled to be issued during the next bimonthly period: <br /> • Draft revisions to the "Quarterly Monitoring Plan, Lincoln Center, Stockton, California," <br /> dated May 3, 1996, and revised April 8, 1997. The revisions will include revised sample <br /> locations. <br /> • Draft revisions to the RDFS Work Plan, which will include revised sampling and updated <br /> laboratory procedures: <br /> 1. Field Sampling Plan (Appendix B), Revision 4 <br /> 2. Quality Assurance Project Plan (Appendix C), Revision 5 <br /> • Draft Interim Source Area Remedial Investigation Report <br /> • Final Phase I Interim Remedial Action Detailed Plan (to be submitted to the Court for <br /> approval) <br /> • Draft Phase II Interim Remedial Action Work Plan <br /> We have included the most current Schedule of Milestones as an attachment to this letter report. <br /> The next bimonthly letter report will be issued in April 1998. Please contact me if you have any <br /> questions or comments. <br /> Sincerely, <br /> Donald T. Bradshaw, R.G. <br /> Principal Hydrogeologist <br /> Site Project Manager <br /> Attachments: Schedule of Milestones; Figure 1 <br /> cc: Distribution List <br /> bimonthly-feb98-0411 I:SRL 3 <br />