My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:51 PM
Creation date
3/31/2020 2:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1998-2000
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Levine.Fricke•Recon <br /> ENGINEERS,HYDROGEOLOGISTSB APPLIED SCIENTISTS <br /> Data Collection and Field Activities Anticipated for February and March 1998 <br /> The following data collection and field activities are anticipated to be conducted at the Site during <br /> the next bimonthly period: <br /> • Fluid levels and groundwater samples will be measured in February 1998. Analytical results of <br /> these samples will be presented in the first quarter 1998 groundwater monitoring report to be <br /> submitted to all parties in May 1998. <br /> • The floor slab in the former Hollywood Video store will be repaired and additional air samples <br /> will be collected from inside the vacant building in February 1998. <br /> • Installation of Phase I IRA extraction wells and piezometers is scheduled to commence in <br /> March 1988. An estimated six to eight weeks will be required to complete this work. <br /> • CPT/PIPP borings will be installed as part of the additional Plume Perimeter Investigation in <br /> March 1998. <br /> Documents Submitted or Received <br /> The following documents were completed and issued during the bimonthly period: <br /> • A letter to the RWQCB regarding "Response to RWQCB's November 18, 1997 Letter <br /> Concerning `Review And Comments Regarding Recent Submittals, Lincoln Center, Stockton, <br /> San Joaquin County,"' dated December 30, 1997. <br /> • A letter to the RWQCB regarding "Additional Work at the Former Hollywood Video Store, <br /> Lincoln Center, Stockton, California," dated January 20, 1998. <br /> • The revised, draft "Proposed Phase I Interim Remedial Action Detailed Plan, Lincoln Center, <br /> Stockton, California," dated January 30, 1998, was submitted to the RWQCB for its and <br /> review and approval. (The RWQCB approved this document on February 11, 1998.) <br /> • A letter regarding "Proposed Additional CPT and Groundwater Monitoring Well Locations, <br /> Plume Perimeter Investigation, Lincoln Center, Stockton, California," dated January 30, <br /> 1998, was submitted to the RWQCB for its review and approval. <br /> The following document was received during the bimonthly period: <br /> • The tentative order from the RWQCB for waste discharge requirements to discharge treated <br /> groundwater from the proposed Phase I IRA treatment system was received on January 29, <br /> 1998. The tentative order was issued for a public comment period, which extends through <br /> March 6, 1998. <br /> bimonthly-feb98-NI I I:SRL 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.