My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:10:51 PM
Creation date
3/31/2020 2:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1998-2000
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
353
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS -7- <br /> SETTLING DRY CLEANING DEFENDANTS <br /> LINCOLN VILLAGE CENTER <br /> GROUNDWATER TREATMENT SYSTEM <br /> SAN JOAQUIN COUNTY <br /> Board or the State Water Resources Control Board pursuant to the CWA and <br /> regulations adopted thereunder. <br /> E Provisions: <br /> 1. The Discharger shall comply with each of the following operational phase discharge <br /> specifications: <br /> a. System Check <br /> Prior to operating the groundwater treatment system with polluted groundwater, <br /> a system check shall be conducted to confirm the proper construction and <br /> operation of the treatment system. The following minimum requirements apply <br /> to this system check phase: <br /> i. An inspection shall be conducted to confirm that all equipment,piping, <br /> instrumentation, and control systems of the groundwater treatment system <br /> have been installed according to the approved design. Any deficiencies <br /> shall be corrected. <br /> ii. To confirm piping integrity,piping of the collection system and treatment <br /> system shall be pressure tested at 150 percent of the design pressure with <br /> potable water. Any leaks shall be repaired. <br /> iii. All instrumentation, control systems, and equipment shall be inspected for <br /> malfunctions. Instrumentation shall be calibrated and operational. All <br /> automatic controls, such as shutdown or alarm switches, shall be certified <br /> operational. Mechanical equipment, such as wet well pumps, air blowers, <br /> and valves,will be cycled or operated. Any functional deficiencies shall be <br /> corrected. <br /> b. Treatment Performance Evaluation <br /> After successfully completing the system check, the treatment performance <br /> evaluation (TPE)shall be conducted to monitor extraction well performance and <br /> to determine the effectiveness of the treatment system to meet treatment <br /> objectives. The TPE shall not begin until the Board has approved the design and <br /> layouts of the extraction and discharge systems. The following minimum <br />
The URL can be used to link to this page
Your browser does not support the video tag.