My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:57:43 PM
Creation date
3/31/2020 2:38:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2001-2005
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> TENTATIVE WASTE DISCHARGE REQUIREMENTS ORDER NO.R5-2003-OOXX 8 <br /> LINCOLN CENTER ENVIRONMENTAL REMEDIATION TRUST <br /> SAN JOAQUIN COUNTY <br /> 5. An evaluation of the changes in aquifer geochemistry including the extent of <br /> PCE reduction, assessment of changes in mobility of other metals, and changes <br /> in chloride. <br /> 6. An analysis of whether the injected GZVI and any breakdown or byproducts is <br /> being captured by the extraction system or is continuing to spread; <br /> I <br /> 7. Cumulative data tables containing the water quality analytical results. <br /> b. After the pilot test and prior to implementing full-scale operation of GZVI <br /> injection, the Discharger shall submit a final remedial action plan and obtain <br /> approval of the Executive Officer. <br /> 4. The Discharger shall comply with the attached MRP No. R5-2003-XXXX,which is part of this <br /> Order, and any revisions thereto as ordered by the Executive Officer. Modifications to MRP No. <br /> R5-2003-XXXX may be made to continue process monitoring if any parameter does not return <br /> to pre-injection conditions. <br /> 5. The Discharger shall comply with the "Standard Provisions and Reporting Requirements <br /> for Waste Discharge Requirements,"dated 1 March 1991, which are by reference, a part of <br /> this Order. This attachment and its individual paragraphs are commonly referenced as <br /> "Standard Provision(s)." <br /> 6. The Discharger shall comply with all conditions of this Order, including timely submittal <br /> of technical and monitoring reports as directed by the Executive Officer. Violations may <br /> result in enforcement action, including Regional Board or court order requiring corrective <br /> action or imposing civil monetary liability, or in revision or rescission of this Order. <br /> 7. Should the evaluation of the pilot test data reveal adverse effects on groundwater quality <br /> due to discharging GZVI, then the Discharger shall notify the Regional Board within 24 <br /> hours, followed by a written summary within two weeks. The Discharger shall clean up <br /> and abate these effects, including extraction of any byproducts. The discharger shall <br /> provide a status summary report within two months detailing activities to implement the <br /> contingency plan. <br /> 8. Prior to any modifications at the Site that would result in material change in the quality or <br /> quantity of GZVI discharge, or any material change in the character, location, or volume of <br /> the discharge, the Discharger shall report all pertinent information in writing to the <br /> Regional Board for review and approval. This Order may be revised prior to <br /> implementation of any modifications. <br /> 9. The Discharger shall maintain records of all monitoring information including all <br /> calibration and maintenance records, copies of all reports required by this Order, and <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.