Laserfiche WebLink
OUR <br /> Response 4: <br /> The Table within the final document will be revised. <br /> Comment 5: <br /> Overview and Schedule <br /> The presentation in Section 5.1 (and possibly other sections as necessary) should be modified to <br /> explicitly acknowledge the A-zone vs B-zone implementation plans. For example, the first sentence <br /> of Section 5.1 should be modified to read as follows: "As discussed in Section 1.2, implementation <br /> of the A-zone portion of the proposed Phase V IRA..., " where the words in italics here represent <br /> the necessary clarification. Likewise, the preliminary schedule presented on Figure 9 should be <br /> modified to include a section for the contingent B-Zone ERD implementation. Even though LFR <br /> and LCERT believe it is premature to specify a schedule for B-zone implementation at this time, a <br /> placeholder for this task should be added to Figure 9. <br /> Response 5: <br /> As noted in Response #1 above, the RWQCB has also asked for continued evaluation of the <br /> B-zone during the A-zone injection monitoring. As an accommodation to this request, the Trust <br /> has committed to providing the RWQCB with a letter format update on the progress of natural <br /> degradation within the B-zone during A-zone injections. If it is determined at that time that <br /> progress is not being made within the B-zone or that the magnitude of the concentrations are of <br /> concern, then a proposal for implementing ERD injections or other technologies will be provided <br /> at that time. This report, as requested by the RWQCB, will be made approximately 7 - 8 months <br /> after the initiation of A-zone ERD injections, and will include a schedule, at such time, as a <br /> recommendation for additional B-zone actions is proposed. <br /> Comment 6: <br /> Reporting <br /> The proposed reporting interval in Section 5.5 of the Detailed Plan should be revised to quarterly, <br /> instead of semiannually. <br /> Response 6: <br /> Monitoring data will be transmitted quarterly; however, reports presenting figures, summary <br /> tables, and recommendations will be transmitted semiannually. <br /> Itr-Fart-RTC-141m LPL-PhV-06750(rimo.d=d 5 <br />