My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2008-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:00:55 PM
Creation date
3/31/2020 2:41:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2008-2015
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cc: Brian.Magee(cberm.com; Scott Forbess <br /> Subject: Update - Please respond <br /> Hi Roberto, <br /> We have a small deviation from the ISCO pilot test work plan and need your written approval for the well inspector: can <br /> you please respond ASAP with an approval,or contact me with questions?This could impact our work in the field <br /> tonight, so your timely response is much appreciated. Please reply all when you respond. <br /> The proposed change is to use a full bentonite pellet seal between the dual-nested monitoring well screen interval <br /> layers. Originally we spec'd a cement grout seal between the screens.The reason we seek approval do this is for <br /> efficiency reasons-- grout takes a full day to cure meaning each well takes 2 days to install. We would like to switch to <br /> the full bentonite pellet seal in order to install one monitoring well per night. Both screens are located within 10 feet of <br /> one another in the shallow A-zone aquifer(<75 ft bgs). <br /> Let me know if you have any questions and thanks in advance, <br /> Caryn <br /> Caryn Quist <br /> Senior Staff Engineer <br /> ------------------------------------------------------ <br /> 3043 Gold Canal Drive,Suite 201 <br /> Rancho Cordova,California 95670 <br /> Office:916.637.8048 Geosyntec <br /> Direct: 916.637.8331 <br /> Cell: 916.712.3991 COl15LL tants <br /> Fax: 916.637.8321 <br /> www.Geosyntec.com I sc;cnnyts r lunuvnrom <br /> This electronic mail message contains information that(a)is or may be LEGALLY PRIVILEGED,CONFIDENTIAL, <br /> PROPRIETARY IN NATURE,OR OTHERWISE PROTECTED BY LAW FROM DISCLOSURE,and(b)is intended only for the use <br /> of the Addressee(s)named herein.If you are not the intended recipient,an addressee,or the person responsible for delivering this to an <br /> addressee,you are hereby notified that reading,using,copying,or distributing any part of this message is strictly prohibited.If you have <br /> received this electronic mail message in error,please contact us immediately and take the steps necessary to delete the message <br /> completely from your computer system. <br /> This message contains information which may be confidential,proprietary,privileged,or otherwise protected by law from disclosure or use by a third party.If you <br /> have received this message in error,please contact us immediately at(925)946-0455 and take the steps necessary to delete the message completely from your <br /> computer system.Thank you. <br /> Please visit ERM's web site:hho:/lw .em.com <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.