My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2008-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
SITE INFORMATION AND CORRESPONDENCE_2008-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 3:00:55 PM
Creation date
3/31/2020 2:41:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2008-2015
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
John Yoakum [EH] <br /> From: John Yoakum [EH] <br /> Sent: Thursday, September 05, 2013 8:58 AM <br /> To: 'Lindsay Capitanich' <br /> Cc: Adrienne Ellsaesser[EH] <br /> Subject: RE: Lincoln Center Permit Application <br /> Lindsay, <br /> I talked to your guys until about 8:30 last night and it was decided that they would need me onsite at about 1:30,just <br /> like you said. <br /> I showed up at 1:25. <br /> They were on MW30a at 40'. <br /> They were at-40' and needed about 2 Yz hours to be ready to grout,so they said to return at 4:00am. <br /> I got a call about 3am saying that they were being delayed and that the grout would be at about 6am. <br /> I got a call about 5:25 saying that the rig had broken down and they would not be ready for inspection,tonight. <br /> EHD has a policy that all after hours inspections have a 3 hour minimum and the rate is at time and a half. <br /> I have been onsite two nights in a row at a 3 hour minimum charge,each night,and we have not installed a well yet. <br /> I want you to be aware that the hours are mounting up on your bill,so you will not be surprised later. <br /> Will we back out tonight? <br /> If so,at what time? <br /> Sorry if this note is a little disjointed, but my sleep schedule is all messed up. <br /> Johnny Yoakum <br /> Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> From: Lindsay Capitanich [mailto•Lindsav Marsh(derm.coml <br /> Sent: Wednesday, September 04, 2013 1:39 PM <br /> To: John Yoakum [EH] <br /> Subject: RE: Lincoln Center Permit Application <br /> Hi Johnny, <br /> As of right now,the rig is scheduled to be repaired by the time fieldwork commences at 7pm tonight. If all goes well,the <br /> well should be ready to be constructed by 11:30pm tonight,with a grout inspection needed at approximately 1:00 am. I <br /> will request updates from the field crew and keep you posted on the time. <br /> Lindsay Capitanich (Formerly Lindsay Marsh) <br /> Project Geologist <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.