Laserfiche WebLink
• Section 10-1 Wstruction Details <br /> Standard Specifications Section 14 Special <br /> Page 4 of 7 <br /> temporarily stored onsite and ultimately disposed of in <br /> a Class II or III landfill, as appropriate. <br /> 14-1.4b. Groundwater and decontamination water: All water <br /> generated during decontamination or destruction shall be <br /> disposed of in accordance with California regulations. <br /> Uncontaminated water shall be discharged to the storm <br /> drain. Wastewater which is below the State MCL's shall <br /> be considered as being uncontaminated. <br /> Contaminated water shall be disposed of by recycling at <br /> the Gibson oil Recycling Facility, Redwood City, <br /> California, or approved equal. <br /> The contract lump sum price paid for decontamination, waste <br /> containment, and sampling shall include full compensation for <br /> furnishing all labor, materials, tools, equipment and incidentals, <br /> and for doing all the work involved in providing adequate <br /> decontamination and waste containment facilities. Price shall also <br /> include all waste sampling and testing required to evaluate the <br /> character of the waste prior to disposal. <br /> The contract price paid for soil disposal (Class II) and <br /> (Class III) shall include full compensation for furnishing all <br /> labor, materials, tools, equipment, and incidentals including <br /> transportation, documentation, and disposal fees. <br /> The contract price for groundwater disposal (contaminated) <br /> shall include full compensation for furnishing all labor, <br /> materials, tools, equipment, and incidentals including <br /> transportation, documentation, and disposal fees. <br /> The contract price for groundwater disposal (uncontaminated) <br /> shall include full compensation for furnishing all labor, <br /> materials, tools, equipment and incidentals including sampling and <br /> testing prior to disposal. <br /> 14-1.5 PROTECTION OF FACILITIES AND IMPROVEMENTS <br /> The contractor shall protect and maintain all existing <br /> improvements including fences and roads against damage from <br /> equipment and vehicular traffic. Any damage shall be repaired by <br /> the contractor. The contractor shall protect utility lines and <br /> appurtenances that are to remain. It is the contractor's <br /> responsibility to locate existing utilities on-site. Any damage <br /> shall be repaired by the contractor. <br /> During periods when no work is being done on the well, such as <br /> overnight or while waiting for sealing material to set, the well <br /> and surrounding excavation, if any, shall be covered. The cover <br /> shall be sufficiently strong and well enough anchored to prevent <br /> the introduction of foreign material into the well and to protect <br /> the public from a potentially hazardous situation. <br /> 6691WEMSECIION.14 <br />