My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_2008-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
0
>
2900 - Site Mitigation Program
>
PR0506203
>
WORK PLANS_2008-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 2:59:40 PM
Creation date
3/31/2020 2:47:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
2008-2014
RECORD_ID
PR0506203
PE
2960
FACILITY_ID
FA0007271
FACILITY_NAME
LINCOLN CNTR ENV REMEDIATION TRUST
STREET_NUMBER
0
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosynte& <br /> consultants <br /> 3. SVE/AS SYSTEM DECOMISSIONING <br /> System decommissioning activities included permitting, disconnecting the SVE/AS <br /> treatment equipment and conveyance piping, destroying the SVE/AS wells, and making <br /> surface pavement repairs. The location of the conveyance piping and wells to be <br /> destroyed are shown on Figure 2. The construction details of the wells are summarized <br /> on Table 1 and include: <br /> • Thirty seven SVE wells installed between 28- and 30- feet below grade; <br /> • Twenty two SVE monitoring probes installed between 20-to 30- feet below <br /> grade; <br /> • Forty five vertical air sparge wells installed between 57- to 66-feet below grade; <br /> and <br /> • Fourteen air sparge wells installed at an angle under Benjamin Holt Drive <br /> installed with a total well length of 54-to 76- feet long. <br /> 3.1 Permitting <br /> The Trust will obtain well destruction permits from SJCEHD following approval of the <br /> Work Plan by the CVRWQCB. Field activities will be coordinated with SJCEHD for <br /> inspection of the field work as needed. <br /> SVE wells SVE-011 and SVMW-02lare located off-Site in the City of Stockton right- <br /> of-way to the west along N Gettysburg Place. Following approval of the Work Plan the <br /> Trust will obtain necessary encroachment permits for destruction of these off-Site wells. <br /> The encroachment permits will be submitted with the well destruction permit <br /> application per SJCEHD guidelines. <br /> 3.2 SVE and AS Equipment Removal <br /> Treatment system components associated with the SVE/AS system will be mothballed <br /> and secured to prevent unintentional operation. The Trust expects that the SVE/AS <br /> equipment located in the treatment compound will remain in place while the <br /> groundwater extraction and treatment system (GETS) continues to operate. All <br /> treatment equipment will be properly removed after the GETS is permanently <br /> shutdown. <br /> In order to be least intrusive to business activities at the Site, all subgrade SVE/AS <br /> conveyance piping will be capped in place or removed without significant excavation of <br /> System Decommissioning and Well Destruction Work Plan 5 07/18/2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.