My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0009676
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2900 - Site Mitigation Program
>
PR0505534
>
ARCHIVED REPORTS_XR0009676
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2020 5:14:21 PM
Creation date
3/31/2020 4:46:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0009676
RECORD_ID
PR0505534
PE
2950
FACILITY_ID
FA0006840
FACILITY_NAME
TOSCO SUPER T MARKET
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 03/14/2001 16 57 2004671118 AGE STOCKT©N PAGE 01/02 <br /> Advanced -. <br /> GeoEnvixonmental, Inc. <br /> 14 March 200 <br /> AGE-NC Project No 990770 /2� � r� RECEIVED <br /> F <br /> IBJ MAR 1 5 2001 � <br /> Mr Ray Fnedrickson MIROWWAI <br /> Thrifty Oil #172 /y "'[OCA\-7a <br /> P O Box 2128 <br /> Santa Fe Springs, CA 90670 <br /> Subject. Utility Impi ovement Schedule and Update- First Quarter 2001 <br /> THRIFTY OIL#172 -Tosca Site <br /> 7647 Pacific,Avenue Stockton, California <br /> Dear Mr Friedrickson <br /> • At your request,Advanced GeoEnviroiumental, Inc (AGE) has prepaxed this update .Fol the utility <br /> improvements and remediation equipment installatiori at the above referenced site The following <br /> is a summary of work completed to date <br /> O On 03 October 2000,AGE prepared a request for a medium pi-essure natural gas service from <br /> Pacific Gas and Electric (PG&E) <br /> V On 08 Decembei 2000, a Haber Furnace was delivered to the site and set up with the soil <br /> vapor extraction piping manifold An au-compressor was also installed and vertically secured <br /> at the site Tlias compressor was stolen from the remediation Enclosure on or about 20 <br /> January 2001 (when noted missing) <br /> G On or about 29 December 2000,AGE was informed by Mr Robert Becker of PG&E that the <br /> service would be installed On 15 January 2001, AGE was on site to cut the concrete site <br /> suiface from the drive way and to the gas ureter location at the remediation enclosure <br /> • On 08 February 2001, AGE scheduled with PG&E to excavate the on site line trench for the <br /> new medium pressure gas line PG&E was called off the scheduled Thrifty job, foi <br /> emergency reasons PG&E was unable to reschedule the line improvement due to limited <br /> gas line installation ci ew availabilityand multiple emergencies occuixing Additionally,AGE <br /> was told that the new medium pressure gas line wsta.11ation may require a `boring' crew from <br /> the Sacramento region to install the line under the City of Stockton storm drain line at the <br /> northern edge of the site and the city sidewalk <br /> 887 Shaw Road,Stockton, California 95215 <br /> Tc1cPhonr (209) 467-100G FAX(209) 467-1118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.