Laserfiche WebLink
<� n 9314/2661 16 57 2694671118 AGE STOCKTON PAGE 62/03 <br /> . 1-1 Nlarch 2000 <br /> AGE-NC Pioject No 99-0770 <br /> Page 2 of 2 <br /> On 19 Februaiy 2001, AGE installed a 2" PVC conduit for the new medium piessuue gas <br /> lune AGE informed PG&E that the conduit was ready for the PG&E gas line to be installed <br /> within the conduct The conduit allowed the back filling of the on site trench and allow for <br /> the installation of the new medium pressure gas line immediately However, .PG&E was <br /> unable to Install the new line until 06 March 2001 <br /> On 09 Maich 2001, the electrical improvements and natural gas line were completed and <br /> approved by the City of Stockton <br /> PG&E will Install the medium piessuie natuial gas meter on 16 March 2001 AGE <br /> anticipates testing the SVE unit on that date <br /> If you hav e any questions or require furthei infoiniatton please contact our office at(209)467-1006 <br /> Sixnc ei ely, <br /> • Advanced GeoE avirolameutal, lue. <br /> William Little <br /> Project Geologist <br /> • <br /> Advanced GeoEnviranmental Iric <br />