Laserfiche WebLink
06/19/2000 16 48 562-921-7510 THRIFTY OIL CO <br /> • A thermal oxidizer system will be provided according to the specification addressed in the <br /> Remedial System Design Report, and placed within the remediation compound <br /> • The sewer discharge line has already been connected to the sewer, and the discharge line <br /> stubbed up in the compound. <br /> • Please note that the entire station is concrete surfaced <br /> Scope of Work <br /> The Scope of Work for this RFP shall include all labor, material, equipment, permitting, and i-, <br /> appurtenance unless otherwise noted below(although some permits tees are direct billed to —hi Li <br /> please provide their cost estimates in your bids) <br /> • Procure a medium pressure gas service from PG&E for the VES unit Th:�i <br /> utilization is 750,000 BTU/Hr at 5 psi (medium pressure) We 1 c7,- <br /> a PG&E line in Rivara Road. The contract with PG&E (,-,o- ��; <br /> installation) <br /> ,o- <br /> installation)will be direct billed to Thrifty Service bills will also ue _. <br /> + Provide trenching,backfill, compact and resurface of gas line from the property Iiae L.. <br /> meter location, also crash posts to protect gas meter This work must be coordinated vn th <br /> PG&E due to the piping installation inside this trench is done by PG&E Contractc <br /> clear all underground lines, etc Extreme care must be exercised when treiicizrv7 <br /> break any pipes, lines conduits, etc Disposal of construction debris is the <br /> responsibility. $ <br /> Prepare, submit and acquire the air discharge permit from the San Joaquin County Agar <br /> Pollution Control District(SJCAQNID) The detailed specifications for the VES unit vnII <br /> be supplied to the contractor to prepare the application Permit fees will be direct billed to <br /> Thrifty $� <br /> • Obtain all necessary permitting for this work and obtain all final inspectton sig - r <br /> fees are to be paid by contractor with maximum markup of 10% S_ <br /> • Provide electrical connection from the 230 volt, 100 amp load cent4�1 r- <br /> the remediation system's components (VES unit, compressor, etc ). $ _ <br /> • Procure electrical service from the PG&E,using existing pare-iiista.11ed loaf' t,,- <br /> disconnect, and your newly installed conduits Electrics) service bills will <br /> to Thrifty(together with gas service) $ <br /> + Prepare,submit, and acquire the water discharge permit to the sewer. Pennit fees Vk,1t, - <br /> sanitation department is direct billed to Thrifty. $ <br /> • Provide a control panel at the compound for the groundwater remediation system for all the <br />• junctions,relays, switches, lights,and interlocks for the safe operation of the groundwater <br />