My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
22700
>
2900 - Site Mitigation Program
>
PR0506618
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:16 PM
Creation date
4/1/2020 1:41:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506618
PE
2950
FACILITY_ID
FA0003936
FACILITY_NAME
NELSON READY MIX CONCRETE
STREET_NUMBER
22700
Direction
S
STREET_NAME
STATE ROUTE 99
City
RIPON
Zip
95366
CURRENT_STATUS
01
SITE_LOCATION
22700 S HWY 99
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRIGHT ENVIRONMENTAL SERVICES, INC. <br /> Site Health and Safety Plan <br /> I. GENERAL INFORMATION <br /> Date: April 21, 1998 <br /> Project Name: Nelson Ready-Mix Site <br /> Project Site Location: 1040 Moffat Boulevard, Ripon, California <br /> Client Contact: Mr. Russ Nelson Phone: (209) 599-4025 <br /> Project Manager: Joseph Ramage Date: t{ Zl 9$ <br /> The Project Manager is responsible for all onsite activities, including having all appropriate plans <br /> prepared and distributing the plans to field personnel and to authorized representatives of each <br /> subcontractor employed to perform work on site. The Project Manager is also responsible for <br /> ensuring that the provisions of the Health and Safety flan (HSP) are carried out. This includes <br /> ensuring that all field personnel have received adequate training, that an adequate supply of <br /> safety and emergency equipment is available. <br /> Designated Site Safety Officers: Joseph Ramage Date: <br /> The Site Safety Officer(SSO) is responsible for implementing the site health and safety plan. <br /> This includes ensuring that field personnel have read and signed the HSP, and that a Tailgate <br /> Safety Meeting is conducted on site each day prior to initiating field activities. In addition, the <br /> SSO will be responsible for auditing the site operations for compliance with the health and safety <br /> plan and any applicable federal. state or local requirements. The SSO is required to be on site at <br /> all times. In the SSO's absence, a designated alternate will assume the duties and <br /> responsibilities_ <br /> i <br /> Work Objectives/Scope: Dri116 soil borings and install 3 groundwater monitoring wells, <br /> Wells will also be developed, sampled and surveyed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.