My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25355
>
2900 - Site Mitigation Program
>
PR0508370
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:24 PM
Creation date
4/1/2020 1:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0508370
PE
2950
FACILITY_ID
FA0008045
FACILITY_NAME
PACIFIC AUTO CENTER
STREET_NUMBER
25355
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
25355 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced - <br /> GeoEnvironmental, Ind <br /> Cis <br /> 12 February 1999 FEB 1 7 logo <br /> AGE-NC Project No. 98-0540 ENtVIRr.N;'vpENTA_ ` <br /> FEB 2 3 1999 pcplt4._ , <br /> _V <br /> Mr. Jeff Wong ENVIRONMENTAL HEALTH DIVISION <br /> SAN JOAQUIN COUNTY PHS-EHD 304 E. Weber Ave. Third Floor <br /> 304 East Weber Avenue, 3rd Floor P. O. Box 388, Stockton CA 95201-0388 <br /> Stockton CA 95201 Approved .� <br /> Denied �Jpp � <br /> Subject: Work Plan Addendum Conditions <br /> PACIFIC AUTO CENTER Date_�Z3/q9/q9 by <br /> 25355 North Highway 99, Acampo, California <br /> Dear Ms. Lagorio: <br /> At the request of Mr. Veer Singh, property owner,Advanced GeoEnvironmental, Inc. (AGE) has <br /> prepared the enclosed Work Plan Addendum for 25355 North Highway 99,Acampo, California. The <br /> Work Plan Addendum presents the proposed scope of work to continue the evaluation of the vertical <br /> and lateral extent of hydrocarbon impacts at the site and for the installation of ground water <br /> monitoring wells, if necessary. <br /> Also enclosed is a drilling permit application,permit fee and site-specific health and safety plan. As <br /> a property transfer is being considered, we would like to perform field work as soon as possible in <br /> order to obtain analytical results by Ol March 1999. <br /> If you have any questions or require further information,please contact our office at(209)467-1006. <br /> i. /I9DIi(oAJf1L BOWA)66) gtJO AVAWAgs s <br /> Sincerely, Ot- 5AMFCirS NC NEeD&,D 7O APPR�SS <br /> -fP6 A)OPTH d- AIo2Tu C—AST A5P6C7'5 Or- <br /> Advanced <br /> FAdvanced GeoEnvironmental, Inc. 1-H& 505PFCT0 f LUMC- pt THr rjeh6-P_ UST <br /> TIT. <br /> 2 -rNls ��P-f�PP�ovAL �tDDR�-ssEs/�cMM�vrs <br /> ONLY 0AJ -4_1t; UST 1Nl/aSTI67ATUZ& <br /> Robert E. Mart< {o_A 10N 0 F T1-115 W F- <br /> Project Geologist/Directo f Operations <br /> 3 , ADL)ItioNA>_ in,vEsTl &?Arlur WCP-K MAY <br /> Enclosure6� I�EQUiP'U7D jr— '(NE SITE 6)TeRS <br /> fNTO `Q� �B+}ScJ pN (2��JLTS o� <br /> cc: Mr. Veer Singh-Pacific Auto Center ANAi,YSrS 7AKeV i Al Sf+N i t a 'N 0 R � <br /> OF Tk(s woi2,K) <br /> 4005 North Wilson Way. Stockton. California 95205 !051TIL1r ON OXYW'Af t'5 <br /> Telephone(209)467-1'606 FAX(209)467-1-118 U 5 /A)G- ePA MMT O 9OZO <br /> Mos-r BcCONnRAA-60 W/ 8'760. <br /> ,�-. ANACYS� AGL S D><YL-,ea;P�'rES <br />
The URL can be used to link to this page
Your browser does not support the video tag.