My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25355
>
2900 - Site Mitigation Program
>
PR0508370
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:24 PM
Creation date
4/1/2020 1:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0508370
PE
2950
FACILITY_ID
FA0008045
FACILITY_NAME
PACIFIC AUTO CENTER
STREET_NUMBER
25355
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
25355 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Advanced <br /> GeoEnvironmental, In <br /> 12 February 1999 FEB 17 1999 <br /> AGE-NC Project No. 98-0540 ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> Mr. Jeff Wong <br /> SAN JOAQUIN COUNTY PHS-EHD <br /> 304 East Weber Avenue, 3rd Floor <br /> Stockton, CA 95201 <br /> Subject: Work Plan Addendum <br /> PACIFIC AUTO CENTER <br /> 25355 North Highway 99,Acampo, California <br /> Dear Ms. Lagorio: + <br /> At the request of Mr. Veer Singh, property owner,Advanced GeoEnvironmental, Inc. (AGE) has <br /> prepared the enclosed Work Plan Addendum for 25355 North Highway 99,Acampo,California. The <br /> Work Plan Addendum presents the proposed scope of work to continue the evaluation of the vertical <br /> and lateral extent of hydrocarbon impacts at the site and for the installation of ground water <br /> monitoring wells, if necessary. <br /> Also enclosed is a drilling permit application,permit fee and site-specific health and safety plan. As <br /> a property transfer is being considered, we would like to perform field work as soon as possible in <br /> order to obtain analytical results by 01 March 1999. <br /> If you have any questions or require further information,please contact our office at(209)467-1006. <br /> Sincerely, <br /> Advanced GeoEnvironmental, Inc. <br /> 174 t <br /> Robert E. Mar <br /> Project Geologist/Directo f Operations <br /> Enclosure <br /> cc: Mr. Veer Singh - Pacific Auto Center <br /> 4005 North Wilson Way, Stockton,California 95205 <br /> Telephone(209)467-1006 FAX(209)467-1118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.