My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
2900 - Site Mitigation Program
>
PR0515318
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:54 PM
Creation date
4/1/2020 2:16:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0515318
PE
2965
FACILITY_ID
FA0012087
FACILITY_NAME
FORD CONSTRUCTION CO
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
01
SITE_LOCATION
18846 N HWY 99
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ford Construction <br /> VFF #1 Infection well <br /> Abandonment <br /> 2008 <br /> 4114 Move in KDY Rig # 1 and rig up, Found the well with Opsi tubing and 0 psi casing. Take on water, and <br /> pump 43 barrels of fresh water down 4.5" casing and pump down annulus, pressured up to 500psi_ Full. <br /> Remove production tree, Inspect tubing hanger, Install production tree. Secure rig. <br /> Daily cost:AM Cum cost: so <br /> 4/15 Remove Injection tree, Install 7 1/16", 5M BOP, nipple up and test to 2000psi. Unset packer, remove <br /> casing hanger, circulate, POOH laying down 4.5" casing ( 84 joints and 1 PIP Packer). Measure, Rabbit <br /> and pickup 2 3/8"4.7#, J-55, ELIE, Used tubing to 2972', tagged hard fill, attempt to circulate out.( EPA <br /> declared that would be deep enough to cement). Pull 5 stands and secure rig. <br /> Daily cost:IM Cum cost:WIi <br /> 4116 Rih and tag bottom (&2972', Circulate hole clean, Rig up MMI Cementers, Equalize 150 sacks of"G" <br /> Cement premixed with 2% CaC12, CIP @ 10:00, Pull up to 2000' and reverse circulate clean, pull 5 <br /> stands and Wait on Cement 4 hours. Rih, tag hard cement(a)2269', Circulate, Rig up MMI Cementers, <br /> Equalize 240 sacks of"G" Cement, premixed with 0.1% retarder(a� 2269'. Pull up to 950' and reverse <br /> circulate clean, Pull 5 stands and secure rig. <br /> Daily cost:400 Cum cost:~ <br /> 4/17 Rih and tag top of cement(& 1067'. POH laying down excess tubing, Rig up MMI Cementers and <br /> Equalize 191 sacks of"G" Cement, the first 50 sacks premixed with CAC12, the remaining 141 "G" <br /> cement @ 1067', POH laying down tubing. Wait 4 hours on cement, pickup 6 joints of tubing and tag top <br /> of cement @ 165 . Equalize 32 sacks of cement, pull out laying down tubing and fill hole with cement. <br /> Remove BOP, Rig down the rig, clean out washout pit and secure well <br /> Daily cost:400 Cum cost:Ow <br /> 4/18 Cut off wellhead, dig out cement on top of cellar and dig 5' below ground level, Found the cement 5' <br /> below, mix 2 sacks of cement and weld '/z' plate on 7" casing 5' below ground level, Back fill cellar, clean <br /> pit, prep to move. <br /> Daily cost: Cum cost: up <br /> 4121 Load out and move the rig to another location. <br /> Daily cost:dW Cum cost <br /> Sent 84 joints of 4.5", 10.50#, J-55, ST&C Used casing and packer to Ford Construction's yard <br /> Returned 150 joints of 2 3/8" Used tubing to Mike Cassel's yard. <br /> Injection tree and well head sent to Ford Construction's yard. <br />
The URL can be used to link to this page
Your browser does not support the video tag.