My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
2900 - Site Mitigation Program
>
PR0515318
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:54 PM
Creation date
4/1/2020 2:16:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0515318
PE
2965
FACILITY_ID
FA0012087
FACILITY_NAME
FORD CONSTRUCTION CO
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
01
SITE_LOCATION
18846 N HWY 99
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HISTORY OF INJECTION WELL <br /> Operator Ford Costruction Field County San Joaquin <br /> Well'VFF"1 Injection Well (Permit#CAS900000002) Sec.31 T.4N R.7E MDSAM. <br /> A.P.I. No. Name Irani Engineering Title Petroleum Engineer <br /> (Penin submitbM 19MM (President.Seaelerv.ar Awd) <br /> Date April 24.2008 <br /> (1Ao .wv.wart <br /> Signature <br /> Address 2625 Fair Oaks Blvd.,Sacramento,CA 95864 Telephone Number(916)482.2847 <br /> History must be complete in all detail. Use this forth to report all operations during drilling and testing of the well or during redrilling or altering <br /> the casing,plugging,or abandonment,with the dates thereof.Include such items as hole size,formation lest details,amounts of cement used, <br /> top and bottom of plugs,perforation details,sidetracked junk,balling tests,and Initial production data. <br /> Date <br /> 2008 <br /> 4/14 MIRU workover rig. Found the well with no pressure on tubing and casing. Took on water. Pumped 43 barrels of fresh water <br /> down 4-1/2" casing and pumped down annulus. Filled the well pressured it up to 500 psig. Removed X-mas tree. Inspected <br /> tubing hanger.Installed prodtkption tree back on well. Secured rig. <br /> 4/15 Removed X-mas tree. Installed 7-1/16", 5M BOP. Nippled up and tested BOP to 2000 psig. Unset packer. Removed casing <br /> hanger. Circulated and POOH. Laid down 4-1/2"casing and packer(84 joints of casing and I PIP packer). Measured, drifted <br /> and pickup 2 3/8"4.7#,J-55,EUE, used tubing. RIH with tubing to 2972' and tagged hard fill. Attempted to circulate out fill <br /> unsuccessfully. EPA declared that it would be deep enough for cement plug. Pulled 5 stands and secured rig. <br /> 4/16 RIH and tagged bottom at 2972'. Circulated hole clean. Rigged up MMI Cementers. <br /> Cement Plug n 2972'. Equalized 150 sacks of Class "G" cement premixed with 2% CaC12 at 2972'. CIP @ 10:00 am. <br /> Pulled up to 2000' and reverse circulated clean. Pulled 5 stands and waited on cement 4 hours. RIH and tagged top of hard <br /> cement at 2269'.Circulated and rigged up MMI Cementers. <br /> Cement Plug(4 122691. Equalized 240 sacks of Class"G" cement premixed with 0.1%retarder at 2269'. Pulled up to 950' <br /> and reverse circulated clean.Pulled 5 stands and secured rig. <br /> 4/17 RIH and tagged top of cement at 1067'.POOH laying down excess tubing. Rigged up MMI Cementers. <br /> Cement Plug aA 1067'. Equalized 191 sacks of Class "G" cement at 1067' (the first 50 sacks premixed with CaC12, the <br /> remaining 141 sacks neat Class "G" cement), POOH laying down tubing. Waited on cement 4 hours. RIH with 6 joints of <br /> tubing and tagged top of cement at 165'. <br /> Cement Plug aA 1651. Equalized 32 sacks of cement. Pulled out laying down tubing and filling hole with cement. Removed <br /> BOP.Rigged down the rig,Cleaned out washout pit and secured rig. <br /> 4/18 Cut off wellhead. Dug out cement on top of cellar and dug 5' below ground level. Found the cement 5' below. Mixed and <br /> poured 2 sacks of cement and welded 1/2" steel plate on 7" casing five feet below ground level. Back filled cellar. Cleaned <br /> pit. Prepared to move the rig. <br /> 4/21 Loaded out and moved the rig off location. <br />
The URL can be used to link to this page
Your browser does not support the video tag.