My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
2900 - Site Mitigation Program
>
PR0515318
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:54 PM
Creation date
4/1/2020 2:16:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0515318
PE
2965
FACILITY_ID
FA0012087
FACILITY_NAME
FORD CONSTRUCTION CO
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
01
SITE_LOCATION
18846 N HWY 99
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAM ENGINEERING,INC. <br /> PETROLEUM ENGINEER (j <br /> 2625 FAIR OAKS BOULEVARD,SUITE 10 <br /> SACRAMENTO,CALIFORNIA 95864 APR <br /> 916482-2847 4 2008 <br /> MENT <br /> Ford Construction FAX 916-482-7514 ENWRO NHEALTH <br /> PERMIT/,qERkqCES <br /> VFF No. 1 Injection Well <br /> Location: 830' North and 420 feet East from Southwest corner of <br /> NW/4 of SW/4 of NW/4 of Sec. 31, T 4N, R 7E, MDB&M, <br /> San Joaquin County, California <br /> Elevation: +12 ground, USGS. + 26' KB. <br /> Take all measurements from KB which is 12' above ground. <br /> Keep hole full at all times. <br /> Check operation of BOE daily. <br /> Present Condition <br /> TD 3375' PD 3375' <br /> Casing: 10-3/4", 40.5#, K-55, cemented @ 1690' . <br /> 7", 20#, K-55 cemented @ 28001 . <br /> Liner: 5-1/2", 17#, FJ slotted liner hung from 2771' to 3375' . <br /> Tubing: Details: KB 12.25' <br /> 4-1/2", EUE X 4-1/2" ST&C 1.60' <br /> 84 jts, 4-1/2", 10.5#, K, R2, ST&C 2716.16' <br /> 4-1/2", 8rd, ST&C X 2-7/8", EUE 0.80' <br /> Baker (Lynes) 5-3/8" PIP inflatable PKR 12.31' <br /> Total 2745.14' <br /> Abandonment Program <br /> 1. Move in workover rig. Fill tubing and annulus with freshwater. Install <br /> BOE and test. Unset packer. Pull out and lay down packer and 4-1/2" <br /> tubing. Pick up 2-7/6" or 2-3/8" workstring. Run in hole <br /> with open-ended tubing and tag fill if any and change hole to 9.6 ppg <br /> drilling mud (check with DOG regarding the mud properties and make sure <br /> we are in compliance) . Wash out fill, if any, to bottom. Circulate and <br /> stabilize hole. <br /> 2. Halliburton equalize 150 sacks Class G cement premixed 29 CaC12 at 3375' . <br /> Notify EPA to witness. Wait on cement for 4 hours. Locate top of cement <br /> plug which must be above 26711 . Notify EPA to witness. <br /> 3. Using Halliburton, equalize 240 sacks Class G cement premixed with 0.18 <br /> retarder on top of bottom cement around 2590'-. Notify EPA to witness. <br /> After 8+ hours tag top of cement plug which must be above 1590' . EPA to <br /> witness <br />
The URL can be used to link to this page
Your browser does not support the video tag.