My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
2900 - Site Mitigation Program
>
PR0515318
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:05 PM
Creation date
4/1/2020 2:17:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515318
PE
2965
FACILITY_ID
FA0012087
FACILITY_NAME
FORD CONSTRUCTION CO
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
01
SITE_LOCATION
18846 N HWY 99
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REP`0I,TING PROGRAM NO. 5-01-057 *.00 5 <br /> WOODBRIDGE PARTNERS INC. <br /> VICTOR FINE FOODS FACILITY <br /> FOR CLOSURE OF SURFACE IMPOUNDMENTS AND INJECTION WELL <br /> SAN JOAQUINCOUNTY <br /> Each monitoring well shall be purged three times its well volume or until dry prior to sampling. <br /> Metal analysis shall be reported as dissolved (filter). The Discharger is required to perform <br /> sampling, analysis, and observations according to the schedule in Table 2. <br /> Table 2 - Groundwater Monitoring <br /> Parameters Units Freouency <br /> Field Parameter <br /> Groundwater Elevation Ft.,&hundredths,MSL Quarterly <br /> Temperature °C Quarterly <br /> Specific Conductance umhos/cm Quarterly <br /> pH pH number Quarterly <br /> Monitoring Parameters <br /> Total Dissolved Solids mg/L Quarterly <br /> TPH-gasolinemg/L Quarterly <br /> TPH-diesel mgt Quarterly <br /> Volatile Organic Compounds ug/L Quarterly <br /> (EPA Method 8260,see Attachment C) Quarterly <br /> Bicarbonate Alkalinity mg/L Quarterly <br /> Chloride mg/ Quarterly <br /> Sulfate mg/L Quarterly <br /> Nitrate-Nitrogen mg/L Quarterly <br /> Calcium mg/L Quarterly <br /> Magnesium mg/ Quarterly <br /> Potassium mg/ Quarterly <br /> Sodium mg/L <br /> 4. LCRS Monitoring <br /> These WDRs require closure of Pond 1 and removal of Pond 1's Leachate Collection and <br /> Recovery System (LCRS). Until the Pond 1 LCRS is removed it will be sampled for the <br /> following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.