My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
2900 - Site Mitigation Program
>
PR0515318
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:05 PM
Creation date
4/1/2020 2:17:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515318
PE
2965
FACILITY_ID
FA0012087
FACILITY_NAME
FORD CONSTRUCTION CO
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
01
SITE_LOCATION
18846 N HWY 99
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONTI ORING AND REP PROGRAM NO. 5-01-057 4 <br /> WOODBRIDGE PARTNERS INC. <br /> VICTOR FINE FOODS FACILTfY <br /> FOR CLOSURE OF SURFACE IMPOUNDMENTS AND INJECTION WELL <br /> SAN JOAQUIN COUNTY <br /> Table 1 -Surface Impoundment Monitoring <br /> Parameters Units Frequency <br /> Field Parameter Feet&Tenths <br /> Freeboard aC Quarterly <br /> Temperature umhos/cm Quarterly <br /> Specific Conductance pH number Quarterly <br /> pH Quarterly <br /> Monitoring Parameters mg/L Quarterly <br /> Total Dissolved Solids <br /> Total Suspended Solids mg/L Quarterly <br /> TPH-diesel mg/L Quarterly <br /> TPH-oil&grease mg/L Quarterly <br /> Chloride mg/L Quarterly <br /> Sulfate mg/L Quarterly <br /> Nitrate-Nitrogen mg/L Quarterly <br /> 3. Groundwater Monitoring <br /> The discharger shall establish an evaluation monitoring program within 90 days of adoption of <br /> Waste Discharge Requirements Order No. 5-01-057. In order to fully characterize the horizontal <br /> and vertical extent of pollution in groundwater additional wells must be installed for this site. <br /> Board staff must approve monitoring well location and construction details prior to well <br /> installation. <br /> Subsequent to establishment of the evaluation monitoring program, the following monitoring <br /> wells will be sampled to determine compliance with the Water Quality Protection Standards and <br /> to begin data collection for design of corrective actions: <br /> Zone Background Compliance Evaluation <br /> Wells Well Wells <br /> A MW-lA MW-4A MW-2A, -3A, -5A <br /> B MW-1B MW-2B, -3B, -5B <br /> C MW-1C MW-2C, -3C, -5C <br /> D MW-6D <br /> Groundwater elevations shall be measured quarterly in all monitoring wells at the facility. <br /> Groundwater elevations shall be plotted to produce a groundwater contour map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.