My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
2900 - Site Mitigation Program
>
PR0515318
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:05 PM
Creation date
4/1/2020 2:17:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0515318
PE
2965
FACILITY_ID
FA0012087
FACILITY_NAME
FORD CONSTRUCTION CO
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
01
SITE_LOCATION
18846 N HWY 99
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
161
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REP(,_i ING PROGRAM NO. 5-01-057 z <br /> WOODBRIDGE PARTNERS INC. <br /> VICTOR FINE FOODS FACILITY <br /> FOR CLOSURE OF SURFACE IMPOUNDMENTS AND INJECTION WELL <br /> SAN JOAQUIN COUNTY <br /> The results of any monitoring conducted more frequently than required at the locations <br /> specified herein or by the waste discharge requirements shall be reported to the Board. <br /> B. REQUIRED MONITORING REPORTS <br /> a. Water Quality Protection Standard Report <br /> The Discharger shall submit the"Water Quality Protection Standard"report for review and <br /> approval byRWQCB staff. <br /> b. Detection Monitoring Report <br /> The Discharger shall submit detection monitoring reports quarterly. The reports are due on <br /> 15th day of the month following the calendar quarter in which the samples were taken. <br /> Thus,the first,second,third, and fourth quarterly monitoring reports are due 15 April, <br /> 15 July, 15 October, and 15 January, respectively. <br /> C. Evaluation Monitoring Report <br /> The Discharger shall submit evaluation monitoring reports quarterly. The reports are due on <br /> 15th day of the month following the calendar quarter in which the samples were taken. <br /> Thus,the first,second,third, and fourth quarterly monitoring reports are due 15 April, <br /> 15 July, 15 October, and 15 January, respectively. <br /> d. Annual Monitoring Summary Report <br /> The Discharger shall submit the Annual Monitoring Summary Report to the Board by <br /> 31 January each year. <br /> e. Constituents-of-Concern (COC) 5-Year Report <br /> The Discharger shall submit reports of the results of groundwater monitoring for the <br /> Constituents of Concern every five years,or more frequently if required. The initial COC <br /> Report is due at the end of the first full quarter after these WDRs are adopted. The <br /> succeeding groundwater monitoring for COC Report shall alternate between the Fall and <br /> Spring seasons. The COC Report may be combined with a Detection Monitoring Report or <br /> an Annual Summary Report having a Reporting Period that ends at the same time. <br /> C. STANDARD OBSERVATIONS <br /> Each monitoring report shall include a summary and certification of completion of all Standard <br /> Observations for the surface impoundments until they are closed, and after closure for the surface <br /> expression of the impoundments. The standard observations shall be performed on a monthly <br /> basis and shall include those elements as defined in the Standard Provisions and Reporting <br /> Requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.