Laserfiche WebLink
Woodbridge Partners Inc. - 2 - 29 November 2000 <br /> 6. Within 90 days of completion of closure construction, a closure report prepared by a <br /> professional engineer or geologist registered in the state of California must be submitted. The <br /> closure report at a minimum must include the following: <br /> a. Document the construction work that was done to close Pond 2, <br /> b. Document results of all compaction and infiltration tests and show that they meet or <br /> exceed design'criteria, <br /> c. As-Built drawings for the pond area showing the final drainage pattern, <br /> d. Document that restrictions have been placed on the property deed that will preclude <br /> irrigated agriculture or development of water holding structures in the area of Pond 2. <br /> — Please submit a revised closure plan addressing issues 1 through 6 above by 2 February 2001. <br /> If you have any questions, please contact me at (916) 255-3814. <br /> Ross D. Atkinson <br /> Associate Engineering Geologist <br /> cc: Mr. Mark Melnick, Office of the Attorney General, San Francisco <br /> Mr. David Irey, Deputy District Attorney, Environmental Prosecutions Unit, County of San <br /> Joaquin, Stockton <br /> Mr. Jeff Wong, Environmental Health Department, San Joaquin County, Stockton <br /> Mr. Pat Riddle, Law Offices of Patrick D. Riddle, Acampo. <br />