My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
6349
>
2900 - Site Mitigation Program
>
PR0505312
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 3:36:37 PM
Creation date
4/1/2020 3:32:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0505312
PE
2950
FACILITY_ID
FA0006699
FACILITY_NAME
D V VINEYARDS
STREET_NUMBER
6349
Direction
E
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
6349 E PINE ST 5
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equipment that will not be damaged by water will be placed in <br /> wash tub containing an Alconox (or equivalent) solution and <br /> scrubbed with a brush or clean cloth. Equipment will be rinsed in <br /> a second wash tub. <br /> Equipment that may be damaged by water will be carefully <br /> clean using a sponge and detergent water, and wiped with r� d <br /> free deionized water. Care will be taken to prevent any equipment <br /> damage. <br /> • Rinse and detergent waters will be replaced between borings. <br /> Following decontamination, equipment will be la g <br /> on clean plastic sheeting to prevent contact with c ontam Hated soil.ren <br /> the equipment is not used immediately, the equipment will be c If <br /> or wrapped in plastic sheeting to minimize potential airborne contam- <br /> ination. <br /> 5.3 DRILLING AND HEAVY EQUIPMENT DECONTAMINATION <br /> PROCEDURES AMINATION <br /> Drilling equipment will be decontaminated bet <br /> ween each Decontamination will be done only at the decontamination area boring. <br /> desig- <br /> nated by the Project Leader. Augers will be scraped off as the are <br /> drawn from a borin container for disposal_ The cuttings will be placed in an ay ro with- <br /> drawn <br /> e <br /> P The following steps will be used to decontami- <br /> nate drilling and heavy equipment: <br /> • PersonneI will dress in suitable safety equipment to reduce per- <br /> sonal exposure. <br /> • Equipment heavily caked with soil and/or other material <br /> will be <br /> scraped off with a flat-bladed scraper. The scrapings will be dis- <br /> posed in drums. Drill cuttings will not be washed down the drain <br /> into the sewer system. <br /> Equipment that will not be damaged by water such as drill rigs, <br /> augers, drill bits, and shovels will be sprayed with detergent water <br /> by a high-pressure steamer, then rinsed with clear potable <br /> Care will be taken to adequately clean the insides f the Fater. <br /> stem augers. hollow- <br /> stem <br /> decontamination, drilling equipment will be placed on the <br /> clean drill rig and moved to a clean area <br /> immediately, it will be stored in the designated secure equipment a not used <br /> an area. <br /> 5-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.