My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18678
>
2900 - Site Mitigation Program
>
PR0517377
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/1/2020 3:57:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517377
PE
2965
FACILITY_ID
FA0013386
FACILITY_NAME
CALIFORNIA CONCENTRATE CO
STREET_NUMBER
18678
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
18678 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 9 <br /> Schedule 40 PVC casing will be used for this well installation. This casing <br /> will be 2-inches in outside diameter. The casing will be joined using flush <br /> thread joints with o-rings. Fifteen feet of well intake intervals will be <br /> constructed by placing 10 feet piece of Schedule 40 PVC 0.01-inch machine <br /> slotted screen to the desired depth and completing a sand envelope <br /> consisting of 10 X 20 silica sand opposite the well screen and 2.5 feet above <br /> and below the well screen. The sand pack and seals will be placed using a <br /> surface free fall method. This design will meet the San Joaquin County <br /> and California Requirements on monitoring well design and allow for <br /> long-term ground water monitoring use. The proposed well design is <br /> provided in Attachment No. 1. <br /> Well caps and security casings will consist of PVC cap with an above <br /> grade installation consisting of a steel four inch casings that has a lockable <br /> lid. Monitoring wells will be surveyed by a licensed surveyor. <br /> 3.0 MONITORING WELL DEVELOPMENT AND SAMPLING <br /> 3.1 Task 2—Well Development and Initial Sampling Event <br /> Upon completion of the three monitoring wells, the ground water <br /> monitoring well intakes will be developed using a submersible pump or <br /> bailer after a 12 hour wait period. Stabilization will be determined based <br /> on turbidity and stabilization of the field parameters pl- conductivity and <br /> temperature. A minimum of three well casing volumes will be removed <br /> for development. The casing has an estimated volume of 0.16 gallons per <br /> foot. <br /> Ground Water Sample Collection <br /> Ground Water Monitoring will begin upon the completion of well <br /> development and water level recovered. The drilling technique does not <br /> California Concentrates Monitoring Well Work Plan Issued: June 8,2001 <br /> Revision 1 <br /> JHC Project No.493.01 <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.