My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_SITE INVESTIGATION REPORT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
14961
>
2900 - Site Mitigation Program
>
PR0518235
>
ARCHIVED REPORTS_SITE INVESTIGATION REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:59:34 PM
Creation date
4/1/2020 3:59:31 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
SITE INVESTIGATION REPORT
RECORD_ID
PR0518235
PE
2950
FACILITY_ID
FA0013771
FACILITY_NAME
CAL TRANS (FORMERLY MOHAWK GAS STA)
STREET_NUMBER
14961
Direction
E
STREET_NAME
STATE ROUTE 120
City
MANTECA
Zip
95336
APN
20307028
CURRENT_STATUS
01
SITE_LOCATION
14961 E HWY 120
P_LOCATION
04
P_DISTRICT
000
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract No. 43AO078-G <br /> Page 52 of 60 <br /> conditions of the right of entry agreement. Encroachment permits will be required for all work <br /> within the State operating rights of way. <br /> ' SP-13: Encroachment Permits <br /> ' It <br /> Prior to start of work within State highway right of way, Contractor shall secure an <br /> Encroachment Permit from the District Permit Engineer in the district where the work takes place <br /> r at the direction of the Caltrans Contract Manager shall obtain verbal approval from the <br /> ' egional maintenance managers 48 hours prior to the start of field work. No fee will be charged <br /> he Contractor by the State for this permit and/or approval. <br /> ' SP-14:Traffic Control <br /> Traffic control (barricades, portable flashing beacons, and detours) necessary to accomplish the <br /> contract work within Caltrans right-of-way will be performed by Caltrans unless otherwise <br /> specified in the Task Order. When Caltrans is to provide the traffic control, the Contractor must <br /> request traffic control in advance of the work and obtain proper clearance. Traffic control which <br /> is necessary outside of the Caltrans right-of-way will be the responsibility of the Contractor in <br /> coordination with the appropriate local jurisdiction and will be paid per bid items 59, 60, and 61 <br /> for shoulder closures or as extra work per Article VII.0 for traffic control other than shoulder <br /> closures. <br /> SPA 5:Hazardous Waste Manifest <br /> The Caltrans Contract Manager or his/her designated representative will sign all Hazardous <br /> ' Waste Manifests for hazardous waste removed from the site. The Contractor shall not sign the <br /> Hazardous Waste Manifest as the generator. <br /> ' SPA 6:Underground Services Alert (USA) <br /> Before any Task Order work involving disturbance of the ground beyond surface sampling <br /> ' begins, the Contractor shall obtain an inquiry identification number from USA, documentation of <br /> which must be given to the Caltrans Contract Manager. In Northern California the Contractor <br /> should call 1-800-642-2444. In Southern California the Contractor should call 1-800-422-4133. <br /> ' USA should respond within 48 hours. <br /> SP-17:Owner/Regulatory Contracts <br /> The Contractor shall only contact property owners as directed by the Caltrans Contract <br /> Manager. The Contractor shall coordinate with other agencies, such as federal Environmental <br /> ' Protection Agency (EPA), California Environmental Protection Agency (Cal-EPA), Department of <br /> Toxic Substances Control (DTSC), Regional Water Quality Control Board (RWQCB), local <br /> environmental health agency, and others as necessary to complete the field survey. The <br /> ' Caltrans Contract Manager shall notify and invite the Contractor to all regulatory agency <br /> meetings related to this investigation. All written correspondence with regulatory agencies shall <br /> be submitted to the Caltrans Contract Manager and sent to the agencies by Caltrans. <br /> SP-18:Metrication <br />
The URL can be used to link to this page
Your browser does not support the video tag.