Work Plan for Site Assessment <br /> Former Texaco Service Station <br /> Chevron Site ID 309075 <br /> September 30, 2009 <br /> • Methyl tertiary butyl ether (MTBE), ethanol, di-isopropyl ether (DIPE), ethyl tertiary butyl <br /> ether (ETBE), tertiary amyl methyl ether (TAME), tertiary butyl alcohol (TBA), <br /> 1,2-dichloroethane (1,2-DCA) and ethylene dibromide (EDB), also known as <br /> 1,2-dibromoethane, and ethanol by USEPA Method 8260B <br /> All down-hole drilling and sampling equipment will be steam-cleaned following the completion of <br /> each soil boring. Down-hole equipment will be washed in a tri-sodium phosphate or Alconox® <br /> 6W solution between samples. <br /> 3.6 MONITORING WELL INSTALLATION <br /> V <br /> Upon completion of the soil borings, the monitoring wells will be constructed using 2-inch <br /> outside diameter (OD) poly vinyl chloride (PVC) casing with a 10-foot screen interval of 0.010- <br /> inch slotted PVC screen. The shallow and deep water-bearing zone monitoring wells will be <br /> installed as described below. <br /> 3.6.1 Shallow Water-Bearing Zone <br /> The shallow water-bearing zone monitoring well will be constructed of schedule 40 PVC and the <br /> screen interval will be placed at approximately 65 feet to 75 feet bgs. A 2/12 sand filter pack will <br /> be placed around the well from the bottom of the borehole to approximately 1.5 feet above the <br /> screen interval followed by approximately 2 feet of hydrated coated bentonite chips. The <br /> remainder of the borehole annulus will be grouted using tremie piping to within approximately <br /> one foot of the ground surface. A traffic rated 12-inch diameter flush mounted well box will be <br /> installed in concrete at each location. The total well completion depth and screen interval will be <br /> determined based on observations in the field. Typical construction details of the shallow well <br /> are shown on Figure 3. <br /> 3.6.2 Deep Water-Bearing Zone <br /> The deep water-bearing zone monitoring well will be constructed of schedule 80 PVC and the <br /> screen interval will be placed at approximately 110 to 120 feet bgs. To minimize the potential for <br /> cross contamination between the shallow and deep water-bearing zones, the deep water <br /> bearing zone will be double-cased with steel conductor casing to approximately 80 feet bgs. <br /> The 8.625 inch OD conductor casing will be set in a 15.5 inch OD borehole. The space between <br /> the wall of the borehole and the outside of the conductor casing will be sealed at the base of the <br /> casing with approximately 2 feet of bentonite chips. Grout will then be tremied into the space to <br /> `- seal the remainder of the casing up to approximately 1foot bgs. Once the casing is set and <br /> sealed, an 8-inch diameter borehole will be advanced through the conductor casing to <br /> approximately 120 feet bgs and a 2 inch OD PVC casing will be installed. A 2/12 sand filter pack <br /> will be placed around the well from the bottom of the borehole to approximately 1.5 feet above <br /> the screen interval. The total well completion depth and screen interval will be determined <br /> based on observations in the field. Typical double cased monitoring well construction details are <br /> shown on Figure 4. <br /> \\arcadis-us\oficedata\Sacramento-CA\ENV\CHEVROM309075\6 Deliverables\Work Plan\Downgradient Wells\Work Plan for Downgradient Wells_379910950.doc 4 <br /> Ir. <br />