My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012724
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
ARCHIVED REPORTS_XR0012724
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 2:44:05 PM
Creation date
4/2/2020 2:33:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012724
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ty__ '' Sr � - rar- ..wvy. ,c.atiA tray*.�+,.3' 1 _ ¢ ■ , .r gW-51-0 <br /> tood <br /> The following procedures and precautions must be <br /> uhardware <br /> nders <br /> and implemented for safe use of wire ropes and rigging <br /> Use tool handling hoist only for vertical lifting use <br /> of <br /> tools (except when angle hole drilling) • from the <br /> tool handling hoists to pull on objects awayyufro the <br /> drill rig; however, drills may be moved <br /> dthrous proper <br /> main hoist as the wire rope is spooled <br /> sheaves according to the manufacturer's recommenda- <br /> tions; <br /> When stuck tools or similar loads cannot be raised with <br /> a hoist, disconnect the hoist line and connect the <br /> stuck tools directly to the feed gmec anisforfadthe <br /> drill. Do not use hydraulic leveling jacks <br /> pull to the hoist line or the feed mechanism of the <br /> drill; <br /> When attempting to pull out a mired vehicle or drill <br /> rig carrier, only use a winch on the front or rear of <br /> the vehicle or dril% rig carrier and stay as far away <br /> e wire rope. Do not attempt to use <br /> as possible from the <br /> too] hoists to pu11 oiyc a mired vehicle or a drill rig <br /> carrier; <br /> Minimize thehockloading of a wire rope. - apply loads <br /> The following general safety <br /> smoothly and steadily. <br /> principles should be observed; <br /> - protect wire rope from sharp corners or edges; <br /> - Before using, replace faulty guides, rollers, worn <br /> sheaves, worn sheave bearings, and damaged safety <br /> latches on safety hooks; <br /> Know the safe working load of the equipment and tackle <br /> being used, and never exceed this limit; <br /> - periodically inspect and test clutches and brakes of <br /> hoists; <br /> - Know, and do not exceed the rated and capacityf lifting <br /> rings, links, swivels, shackles, other <br /> aids; <br /> - Always wear gloves when handling wire ropes; <br /> - - Do not use your hands to guide wire ropes on hoist <br /> drums; <br /> project No. 1232 <br /> -S- F1VV1RON1►IENTAL AUDIT,Ilt'C <br />
The URL can be used to link to this page
Your browser does not support the video tag.