Laserfiche WebLink
- <br /> i�, <br />�a <br /> F. <br /> the installation of a new wire rope, first <br /> - Following r e to adjust; <br /> lift a light load to allow the wire oT? <br /> - Never leave a load suspended in the air when the hoist <br /> is unattended; <br /> Keep your hands away from hoists, wire rope, hoisting <br /> pinch points when the slack is <br /> hooks, sheaves, and <br /> en the load is being hoisted; and <br /> boons taken up, and wh <br /> Never hoist the load over the head, body, or feet of <br /> r any personnel.. <br /> 5.7 Ilse of Akers <br /> The following general procedures should be used when <br /> advancing a boring with augers: <br /> Prepare to start an auger boring with the drill rig <br /> level, the clutch or hydraulic rotationcontrol <br /> and the <br /> disengaged, the transmission in low gear, <br /> engine running at a low RPM; <br /> tool handler should establish a <br /> The operator and <br /> for the series of various <br /> system of responsibility <br /> activities required for auger drilling, such as <br /> connecting and disconnecting auger sections, and <br /> inserting and removing the auger fork. The operator <br /> must be sure that the tool. handler is well away from <br /> the auger column and that the auger the <br /> has been <br /> removed before starting rotation; <br /> the manufacturer's recommended pti ethod of <br /> only usenot <br /> ch <br /> securing the auger ,to the power coupling- a wrench, or <br /> the coupling or the auger with your hands, <br /> any other tool during rotation: <br /> - Whenever possible, use tool hoists to handle auger <br /> sections; <br /> Never place your hands or finger under tover bothetoom p <br /> an auger section when hoisting the auger <br /> ground or other hard <br /> of the auger section in the Platform; <br /> surface such as the drill rig p <br /> - Never allow Your feet to get under the auger section <br /> that is being hoisted; <br /> Project No. 1232 <br /> F'1VVIRONiti1EA'TAI,AUDIT,!AC <br />