Laserfiche WebLink
_,,_. K P` �,' �'_�, "�'' N fl" x' ', . �i..ae :rs :�> ;fig. z - .''. }•rte _lR.a -Y,iv .y,ar,'_.- -cs"5,y -iir` <br /> s1' a iw T t., y. '+. rk <br /> ,. +.ta �. $� T� ryr '� <br /> in such a way as to preclude the potential for spreading <br /> contamination, creating a sanitary hazard, or causing litter to <br /> be left at the site. The waste materials will be sealed in <br /> labeled 55 gallon drums, pending the results of the analytical <br /> testinc, at which time the appropriate disposal method(s) will <br /> be detormined. <br /> 10.0 COMMUNICATION PROCEDURES <br /> EAI will supply a portable telephone with direct access to <br /> its office. <br /> Three horn blasts from any project vehicle is the emergency <br /> signal to indicate that all personnel must leave the Exclusion <br /> Zone. <br /> The following standard hand signals will be used: <br /> Hand gripping throat. . . . . . . . .. . . .Out of air, can't <br /> breathe <br /> - Grip partner's wrist or <br /> both hands around waist. . . . . . . . . .Leave area immediately <br /> Hands on top of head. . . . . . . . .. . . .Need assistance <br /> Thumbs Up. . . . . . . . . . . . . . . . . . . .. . . .OK, I am alright, I <br /> understand <br /> Thumbs Down. . . . . . . . . . . . . . . . . . . . . .No, Negative <br /> 11.0 EMERGENCY PROCEDURES <br /> 11.1 Medical Facility <br /> Based on the types of activities to be completed as part of <br /> the assessment activities, the potential for an emergency <br /> exists. In the event of an emergency that is beyond the <br /> capabilities of on--site trained personnel, the following <br /> resources vill be utilized as appropriate: <br /> Ambulance. . . . . . . . . . . . . . . . . . . . . . . . . . 911 <br /> Fire Department. . . . . . . . . . . . . . . . . . . . 911 <br /> Paramedics. . . . . . . . . . . . . . . . . . . .. . . . . 911 <br /> Police. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 911 <br /> Project No. 1232 -15- <br /> EVVIRO:WENTAL AUDIT,]AIC., <br />