Laserfiche WebLink
Attachment B <br /> Lump Sum by Task <br /> Cost Estimate <br /> September 24, 1998 <br /> Task Lump Sum <br /> Estimate <br /> I—health and Safety Plan Preparation $ 150 <br /> 2—Perm its 2,780 <br /> 3—Utility Clearance and Utilization 1,050 <br /> 4---Mobilization and Demobilization 9,Q90 <br /> 5--Remediation Well Installation 35,000 <br /> 6—Trenching and Piping Installation 49,000 <br /> 7—Construction of Aboveground Treatment Enclosure 4,060 <br /> 8--Wel I Vault/Pull Box Installation 17,400 <br /> 9—Soil/Groundwater Remediation Equipment Installation 62,850 <br /> 10—Start-up and Troubleshooting 5,725 <br /> 1 ]—Standard Operation and Maintenance 3I,625 <br /> 12---Quarterly Groundwater Sampling 14,000 <br /> 13—Quarterly Reports and California UST Reimbursement Fund 8,694 <br /> Compliance <br /> Total $241,424 <br />