My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012539
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
ARCHIVED REPORTS_XR0012539
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 4:54:37 PM
Creation date
4/2/2020 4:26:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012539
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/05/98 MON 11 51 FAX 925 363 7275 TERRA NAC NOR CAL 0 006 <br /> TERRA VAC WESTERN REGION <br /> BELLING RATE SCHEDULE <br /> MIMI T S <br /> PRINCIPAL $172 <br /> SUPERVISING PROFESSIONAL $142 <br /> SENIOR SCIENTIST $129 <br /> SENIOR PROJECT MANAGER $112 <br /> PROJECT MANAGER $102 <br /> SENIOR ENGINEER $1.02 <br /> PROSECT ENGINEER $ 91 <br /> STAFF ENGINEER $ 80 <br /> SENIOR GEOLOGIST $ 95 <br /> PROJECT GEOLOGIST $ 86 <br /> STAFF GEOLOGIST $ 7S <br />• SENIOR CHEMIST $ 94 <br /> PROJECT CHEMIST $ 85 <br /> STAFF CHENUST $ 74 <br /> ELECTRICAL SPECIALIST $7S <br /> FIELD SUPERVISOR $ 71 <br /> REMEDIATION SPECIALIST $ 62 <br /> CHEMICAL TECHNICIAN $ 62 <br /> SENIOR REMEDIATION TECHNICIAN $ 56 <br /> REMEDIATION TECHNICIAN $ 51 <br /> TECHNICIAN $ 45 <br /> DRAFTINGICAD $ 48 <br /> ADMIN/CLERICAL $41 <br /> 4-THF,.13 CHARGES <br /> A. Supplies and Other Project Expenees Cost+ 15% Adm Burden <br /> B Travel Expenses Cast + 15% Adm Burdca <br /> C Subcontractor Charges Cost+ 15% Adm Burdcn <br /> D Equipment Charges See Schedule 2 <br /> E. Materia] Charges See Schedule 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.