Laserfiche WebLink
10/05/98 ICON 11 51 FAX 925 363 7275 TERRA VAC NOR CAL 121 005 <br /> Task 5-Reporting $ 13,900 <br /> A source test report will be submitted to the San JoaquinValley Unified Air Pollution <br /> Contiol Distract within 30 days of conducting the test A startup report will be submitted <br /> within 60 days of system startup, and quarterly reports will follow thereafter <br /> Costs for verification soil sampling or any well abandonments are not included <br /> lash I- Work Plan/PerinittinglIMS g 10,690 <br /> 1 ask 2-Design & Planning $ 31640 <br /> Task 3-Remedial System.Installation & Startup $110,910 <br /> Taste 4- Operations and Mainlenance $207,400 <br /> Task 5-Reporting S 13,900 <br /> Total Project Costs $3441440 <br /> these estimated costs are based on design infoiniation as provided in the "Corrective <br /> Action Plan for the Montgomery Ward Auto Service Centei, 5400 Pacific Avenue. <br /> Stockton, California," by Environmental Audit, Inc , July 6, 1998, and are believed to be <br /> accurate within 15 percent A fee schedule is attached One year of SVE operations with <br /> sparging is estimated, followed by another year of sparging/air injection Costs foi <br /> quarterly groundwater monitoring are not included <br /> If you have any questions, please call me at (925) 363-7322 <br /> Sincerely, <br /> cz-ef <br /> Robert A (Tony) Dahl <br /> Senioi Chemist <br />