Laserfiche WebLink
Kennedy/Jenks Consultants <br /> water streams will be coordinated so that samples will also be collected from the sump to <br /> characterize the discharge to the land application areas. <br /> 4.3.2.2 Wine Ion Exchange <br /> Three samples will be collected during operation of the wine ion exchange unit. <br /> Either a portable flow meter will be used at the Facility or estimates made so that process water <br /> flow can be periodically monitored for the wine ion exchange stream. During operation of the <br /> wine ion exchange unit, representative flow values will be recorded. <br /> 4.3.2.3 Water Softening <br /> Two samples will be collected from the distillery and bottling room water softener process water <br /> regeneration streams (spent regenerant streams). The water softener brine stream quality <br /> should not vary depending on Facility seasonal operation, therefore, only two samples will be <br /> collected from each water softener. If the variability between samples from the two water <br /> softeners is high, a third sample will be taken from each softener. <br /> Either a portable flow meter will be used to monitor flow from the water softener spent <br /> regenerant or it will be estimated. During operation of the water softeners, representative flow <br /> values will be recorded. <br /> 4.3.2.4 Bottling Room <br /> Three samples will be collected from the bottling room during cleaning. Flow will be estimated. <br /> 4.3.2.5 Boiler Water Blowdown <br /> Three samples will be collected from the boiler water blowdown stream. The boiler water <br /> blowdown quality should not vary depending on Facility seasonal operation, therefore, only <br /> three samples will be collected. <br /> Estimates will be made of the boiler water blowdown flow. During operation of the boiler, <br /> representative flow values will be recorded. <br /> 4.3.2.6 Distillation <br /> The distillery operates approximately six weeks out of the year. Due to the infrequent operation <br /> of the distillery, three samples will be collected from the stillage. <br /> Estimates will be made of the stillage process water stream during operation. <br /> 4.3.2.7 Non-Contact Cooling Water <br /> The non-contact cooling water is not expected to vary by season however, two samples will be <br /> collected from the cooling tower non-contact cooling water and one sample will be collected <br /> from each evaporative condenser location (three total) for a total of five non-contact cooling <br /> water samples. <br /> Groundwater Protection Work Plan, The Wine Group Page 4-4 <br /> Franzia Winery, Ripon, California <br />