My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:44:54 PM
Creation date
4/3/2020 1:39:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sierra-Pacific Groundwater Consultants, g <br /> Geologists, Engineers, and Compliance Specialists l •e,r t_: t..; _ E..2 f <br /> October 21, 1996 F <br /> i <br /> ( i <br /> Ms. Wendy Wyels <br /> Central Valley Regional Water Quality Control Board <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br /> Subject: Transmittal of Sierra-Pacific Demolition and Excavation Work Plan, Cargill Port Road No. j <br /> 8 Facility, Stockton, California Facility, Sierra-Pacific Project No. 96-128.06 <br /> Dear Ms. Wyels: <br /> Sierra-Pacific Groundwater Consultants, Inc. (Sierra-Pacific)is pleased to submit the enclosed Facility <br /> Demolition and Soil Excavation work plan for your review and authorization. Demolition work is <br /> scheduled to begin at Cargill's Port Road No. 8 facility on Friday October 25, 1996. <br /> Upon the completion of demolition activities, Sierra-Pacific will conduct a site tour to visually identify <br /> areas of soil staining. Depending on the results of the tour, the soil excavation work plan may need <br /> to be modified. Siena-Pacific anticipates that soil excavation activities will begin in April 1997. <br /> We look forward, to your comments. Should you have any questions concerning the information <br /> provided, please call. <br /> Sincerely, <br /> S -PACIFIC GROUNDWATER CONSULTANTS, INC. <br /> i <br /> ck G. Durham <br /> Compliance Projects Manager <br /> PGD/jb <br /> Enclosure <br /> c: G. Rimmey <br /> J. Holm <br /> J. Rapp <br /> .M.-Infurna <br /> `C :- Wall <br /> (916)933-1468 <br /> 4911 Windplay Drive,Suite 4 <br /> El Dorado Hills,California 95762 (916)933-3197 FAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.