My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:46:27 PM
Creation date
4/3/2020 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> ti <br /> Work Plan <br /> Facility Demolition and Soil Excavation <br /> Stockton,California <br /> Sierra-Pacific Project No.95-128.06 <br /> • Contractor's documented health and safety program must address demolition, removal, <br /> Lhandling, loading, transportation, and disposal of structures, tanks, pipes, pavement, and other <br /> materials. The contractor must provide emergency telephones, an emergency shower, and <br /> toilet facilities for workers. <br /> • The contractor must include provisions for workers working in dark areas without power. <br /> The contractor must provide generators for power tools and a means to convey water for <br /> cleaning and dust control. <br /> LA pre-construction meeting will be scheduled with Cargill management and Griffith to review this <br /> work plan and revised H&S plan requirements. Upon initiation of the demolition work, a second <br /> H&S meeting will be scheduled, that will include Sierra-Pacific, Cargill management and all on-site <br /> Contractor employees. Upon completion of the meeting, Cargill will manage all contractor on-site <br /> health and safety activities. <br /> L5.0 PROJECT SCHEDULE <br /> LSierra-Pacific is prepared to initiate work described in this work plan upon authorization from Cargill. <br /> Completion of the scope of work is dependent on the time necessary to clean and remove the existing <br /> Ltanks and Product lines. In recent weeks, Sierra-Pacific has been in contact with Cargill management <br /> f and its contractor to discuss this scope of work. Based on these discussions, Sierra-Pacific anticipates <br /> 6. that pre-demolition activities will begin during the week of October 21, 1996 and demolition activities <br /> to be completed by early December 1996. Soil excavation activities are tentatively scheduled for <br /> May of 1997. Should a detailed completion schedule be requested, Sierra-Pacific will work with <br /> Cargill management and its contractor in developing a formal schedule with identified milestones and <br /> completion dates. <br /> L <br /> Sierra-Pacific Groundwater Consultants, Inc. 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.