Work Plan for Installation of <br /> Monitoring Wells(CW-01,CW-02,and CW-03) <br /> Cargill,Port Road No.8 Facility,Stockton,CA <br /> Sierra-Pacific Project No.95-128.04 <br /> 4.0 HEALTH AND SAFETY PROGRAM <br /> A health and safety plan to support the field work was developed as a stand-alone document <br /> for Sierra-Pacific's soil sampling and well installation programs at the Port Road No. 8 site <br /> L (Appendix A). The plan will be used for safety training and as a field reference document for <br /> project operations. A site safety officer will be selected before initiating field work. Principal <br /> risks associated with the well installation relate to intercepting a buried gas lines, water lines, <br /> and optic fiber cables known to be present at, or near, the subject site. Overhead electrical <br /> wires must be avoided. All personnel will be required to participate in site safety meetings, <br /> discussions of work safety, and the establishment of sound emergency procedures. Hard hats, <br /> [. eye protection, steel-toed work boots, and protective gloves will be worn at the facility. <br /> 5.0 PROTECT SCHEDULE <br /> The wells can be installed within 10 working days following authorization to proceed, contingent <br /> upon weather, and the availability of a drilling contractor, and materials. The well installations <br /> should require one day to complete. Laboratory test results should be available within 10 to <br /> 15 working days of sample submittal. Sierra-Pacific's report of results will be completed within <br /> 15 working days after laboratory results become available. <br /> L <br /> Sierra-Pacific Groundwater Consultants, Inc. 5 <br />