Laserfiche WebLink
Work Plan for Installation of <br /> Monitoring Wells(CW-01,CW-02,and CW-03) <br /> Cargill,Port Road No.8 Facility,Stockton,CA <br /> Sierra-Pacific Project No.95-128.04 <br /> 6.0 REMARKS AND SIGNATURES <br /> The approach used in this work plan represents our professional judgement and opinions. <br /> These opinions are based on currently available client information, and were developed in <br /> accordance with currently accepted hydrogeologic and engineering practices. Other than this, <br /> no warranty is implied or intended. <br /> SIERRA-PACIFIC GROUNDWATER CONSULTANTS, INC. <br /> 6� <br /> { This work plan was prepared by: <br /> %AL-4e_ -A.:---- -L <br /> g <br /> L John 344r4lren Rap CVG-1133 Date <br /> Senior Engineering Geologist <br /> This work plan was reviewed by: <br /> En— D. Chase, CEG-1088 Date <br /> Senior Engineering Geologist <br /> 0M6/PLAN128CJSR/JLB <br /> it <br /> L Sierra-Pacific Groundwater Consultants, Inc. �" 6 <br />