My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:46:27 PM
Creation date
4/3/2020 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> Site Health&Safety Plan <br /> Cargill,Inc.,Port Road No.8 <br /> Stockton,California <br /> Sierra-Pacific Project No.95-128.02 <br /> contractor health and safety regulations, and safety requirements must be complied with by <br /> project personnel. Personnel assigned to this project area also responsible for: <br /> • Taking all reasonable precautions to prevent injury to themselves and to their <br /> fellow employees; 4 - <br /> • Performing only those tasks which they trained to perform; and <br /> • Notifying the SSO of any special medical problems ,i.e., allergies)) and ensuring <br /> that all on-site personnel are aware of any such problems. <br /> L <br /> All personnel will be repeatedly admonished to exercise common sense and good judgement <br /> in their approach to their work. Workers will also be told to notify a supervisor or the SSO of <br /> any observed unsafe condition. The H&SP outlined rules, guidelines, and recommended work <br /> practices. Each worker will be directed to read and follow those guidelines. <br /> CWorkers and visitors will be denied access to work areas where entry may pose unacceptable <br /> health risks. Immediate evacuation of the work area could be ordered, should working <br /> conditions be determined questionable and potentially dangerous. <br /> At each of the sites, a relatively clean support area will be maintained for rest breaks, safety <br /> meetings, paper work, and resupply. Safety briefings and informal discussions will take place <br /> at the beginning of each work day and as situations warrant. The meetings will be initiated by <br /> r the SSO or Project Manager in response to potential health and safety risks for the work to be <br /> L performed on that day or to some new work situation. Workers will be encouraged to make <br /> suggestions on how to operate more effectively and safely. The support area will also be <br /> designated to serve as an evacuation staging area. <br /> L _ <br /> Sierra-Pacific Groundwater Consultants, Inc. 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.