My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:46:27 PM
Creation date
4/3/2020 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Site Health&Safety Plan ff <br /> Cargill,Inc.,Port Road No.8 1 <br /> Stockton, California <br /> Sierra-Pacific Project No.95-128.02 <br /> • Permit visitors at work sites only at the direction of and with the permission of <br /> the client representative. Visitors shall abide by the requirements specified in this J <br /> H&SP and,when possible, shall be restricted from areas of potential exposure to <br /> hazardous substances. ' <br /> • • Establish an area in the support zone upwind of the work zone for personnel to <br /> assemble in the event of an excavation of the work zone. <br /> J <br /> • Monitor operations for the existence of hazardous conditions. Monitor personnel <br /> for signs of exposure, heat stress, fatigue, etc. <br /> • Evaluate the results of the monitoring program and determine impacts on future <br /> operations. <br /> • Ensure that environmental and personnel monitoring operations are ongoing and <br /> in accordance with technical specifications, procedures, and project instructions. J <br /> • Monitor site conditions during operations to determine whether any changes in <br /> work zones or personnel protection are required. <br /> • Ensure that proper personal protective equipment (PPE) is available and worn 1 <br /> by workers. Ensure that PPE and other equipment is maintained and properly J <br /> stored. <br /> t <br /> • Ensure that work areas are kept clean in order to reduce the potential for general <br /> safety hazards. <br /> • Know emergency procedures and contacts. <br /> J <br /> • Conduct work site safety briefings including: contents of this H&SP, safe work 1 <br /> practices, PPE use, and emergency procedures. <br /> J <br /> 43 All On-Site Personnel <br /> All personnel assigned to this project are responsible for following this H&SP, for using safe J <br /> work practices, and for wearing the PPE specified by the SSO. Project personnel shall report <br /> hazards and unsafe conditions and practices to the SSO. All federal, State, local, and client 1 <br /> J <br /> 4, <br /> Sierra-Pacific Groundwater Consultants, Inc. 6 J <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.