My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:46:27 PM
Creation date
4/3/2020 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health&Safety Plan <br /> Cargill,Inc.,Port Road No.8 <br /> Stockton,California <br /> Sierra-Pacific Project No.95-128.02 <br /> 1 <br /> 9.0 EXPOSURE MONITORING PLAN <br /> The SSO shall obtain the necessary monitoring equipment prior to work initiation. Other <br /> equipment deemed necessary by the SSO prior to work initiation shall be obtained at his <br /> direction. The SSO shall also ensure that these instruments are used only by persons who have } <br /> had prior experience with their care, calibration, and operations and who know their limitations. J <br /> No work shall be done unless this instrumentation is available and in proper working order. <br /> Due to the low population density of the sites,low levels of known contaminants, and minimal <br /> ground disturbance associated with the soil sampling , community monitoring is not necessary <br /> or practical <br /> 9.1 Direct Reading Instruments <br /> Preliminary air monitoring will be performed during the initial phases of the project. Direct- <br /> reading monitoring equipment will include the use of Ammonia Drdger Tubes. This monitoring <br /> equipment should be used in accordance with following: <br /> Equipment: Ammonia Drager Tubes and Pump <br /> Location(s) of Use: Within immediate work area <br /> When to Use: During work <br /> Action Level: 50 ppm <br /> Action: Upgrade personal protection to Level C when Drdger readings exceed 100 <br /> ppm in breathing zone of site workers. Record all changes in PPE and <br /> monitoring equipment readings in the Log of Site Safety. <br /> Sierra-Pacific Groundwater Consultants, Inc. _ 22 <br /> j <br /> j <br />
The URL can be used to link to this page
Your browser does not support the video tag.