My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:46:27 PM
Creation date
4/3/2020 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Health&Safety Plan <br /> J <br /> Cargill,Inc.,Port Road No.8 <br /> Stockton, California <br /> Sierra-Pacific Project No.95-128.02 <br /> • Decontamination and disposal of personnel protective apparel and equipment; J <br /> • Disposition of any contaminated materials; <br /> • Minimization of personnel exposures through appropriate use of administrative 1 <br /> work practices consistent with ALARA; J <br /> • Use and operation of electrical equipment; <br /> • Use and maintenance of personnel protective apparel and equipment; <br /> • Personnel air monitoring protocols for evaluation of full-shift and short-term <br /> chemical exposures; and <br /> • Respiratory protection as per 29 CFR 1910.134 and ANSI Z88.2. <br /> 10.4 Communication Methods <br /> 10.4.1 On-Site Communications <br /> A mobile phone will be on-site at all times to contact emergency responders. <br /> 10.4.2 Off-Site Communications <br /> J <br /> Emergency backup telephones are available at the site. <br /> 10.5 ,Engineering Controls <br /> Soil borings will be properly closed or covered upon the completion of daily sampling J <br /> operations. On-site water is available for dust suppression in the event that sampling operations <br /> are observed to contribute to dust generation. <br /> J <br /> J <br /> J <br /> _ J <br /> Sierra-Pacific Groundwater Consultants, Inc. 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.