Laserfiche WebLink
i <br /> L <br /> Soil Sampling Work Plan <br /> L Cargill,Port Road No.8, <br /> Stockton,California <br /> Sierra-Pacific Project No.95-128.01 <br /> L <br /> L procedures. Hard hats, eye protection, steel-toed boots, and gloves will be worn at all times at <br /> the facility. Full-face respirators will be readily available during drilling should ammonia vapor <br /> Lconcentrations be present. <br /> L The principal risks associated with this work relate to buried and overhead electrical lines, and <br /> operation of the Bobcat tractor. Chemical hazards are principally related to anhydrous <br /> Lammonia and phosphoric acid. <br /> 5.0 PROTECT SCHEDULE <br /> LThe work described in this proposal can be initiated within ten(14) days following authorization <br /> to proceed, contingent upon weather, contractors, and materials availability. The work should <br /> Lrequire less than six (6) field days to complete, unless the lateral extent of nitrogen <br /> contamination is larger than anticipated. <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> LSierra-Pacific Groundwater Consultants, Inc. 6 <br /> L <br />